Amazon Bank Stability / # <br />Item <br />Direct cost <br />Cost <br />Quant. <br />Unit <br />Sub total <br />Engineering <br />15.00% <br />$37,050.00 <br />Permitting <br />3.00% <br />$7,410.00 <br />Staff Support <br />1.00% <br />$2,470.00 <br />Bid I Does I Warnty <br />0.50% <br />$1,235.00 <br />Mobilization <br />1,0000 <br />'is <br />$10,000.00 <br />Traffic Control <br />3000 <br />Is <br />$3,000.00 <br />Erosion Control <br />5000 <br />c <br />Is <br />$5,000.00 <br />Force Account #1 <br />FA <br />$20,000.00 <br />Force Account #2 <br />Rock Material <br />35 <br />35(10 <br />to <br />$122,500.00 <br />Wattle (willow/coir) <br />4 <br />16000 <br />if <br />$64,000.00 <br />Veg. Stakes <br />1.5 <br />'16900 <br />ea <br />$22,500.00 <br />Const. Total <br />Project Total <br />~}..0 V-- <br />