CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION <br />. Change Order Job# 4585 <br />Contract # 2009-00020 CTOR: CPM Develo ment Cor oratio p p n Change Order # 1 <br />(ADDRESS) dba E e Sand & Gravel Date: 10!22109 PO Box 1067 CAMS Date: <br />Eugene, OR 9T44D Reviewed by: Date: <br />PROJECT: Pavin Bond Measure - Baile Hill Road From W.18th Avenue Inspector: R. Remmers to Bertelsen Road <br />Proj. Mgr. S. Milovich Principal Eng. M. Cahill <br />You are directed to make the following changes in this contract: <br />Contract <br />Item No. <br />540 Portable Chan eable Messa a Board 550 Pa er Joints Ins#all & Remove <br />401 Loo Detectors Installation 411 Audible Pedestrian Device Com fete <br />421 Street Li hts Cam lete 560 Install RRFB <br />5l0 Over Excavation & Stabilization <br />580 Concrete Remove & Re lace <br />This changes the bid items as follows: <br />Contract Contract <br />Item Time Quantity Unit Amended Net No. Item Change (Units) Cost Amount Change Change <br />540 Portable Changeable Message Board Ori final 0.00 O.OD 0.00 $0,00 <br />Revised O.DO 0.00 0.00 Amended 1A0 l.S $1842.75 $1842.75 $1842.75 <br />550 Paper Joints Install & Remove Ori final 0.00 0.00 O.OD $0.00 Revised 0.00 A.00 O.DD <br />Amended 1.00 LS $15 224.51 $15 224.51 $15 224.51 401 Loop Detectors Installation Ori final 0,00 0.00 0.00 $0.00 <br />Revised OAO 0.00 D.00 <br />Amended 1A0 LS $1065.00 $1065.00 $1065.OD 411 Audible Pedestrian Device Complete Ori final OAO LS O.OD 0.00 $O.DO <br />Revised OAD LS 0.00 O.OD Amended 1.00 LS $2 477.00 $2 477.00 $2 477.OD <br />421 Street Lights Complete Ori final 0.00 0.00 0.00 $D.pO <br />Revised O.DO 0.00 0,00 Amended iA0 LS $13 832.33 $13 832.33 $13 832.33 <br />560 Install RRFB Ori final 0.00 0.00 0,00 $0.00 Revised 0.00 0.00 0.00 <br />Amended 1.00 L5 $12 499.00 $12 499.00 $12 499.00 570 Over-Extavation & Stabilization Ori final 0.00 O.DO 0.00 $0,00 <br />Revised 0.00 0.00 0.00 <br />Amended 1.00 tS $5 634.00 $5 634,00 $5 634.OD 580 Concrete Remove and Replace Ori final 0.00 0.00 0.00 $0.00 <br />Revised O.DO 0.00 0.00 Amended 1.DD LS $3156.12 $3156'.12 $3156.12 <br />The original contract work days are o.o da s The contract time change this C.0 D.o da s <br />The contract time change by previous C.0.'s D.o da s The new contract work da s are o.o da s <br />The original contract sum was 93D 287.95 Net change by previous change order $o.oD <br />Net change due to amendment by previous change order $o.DD <br />The contract sum prior to this change order was $930 287.95 This change order will change contract sum by this amaunt $55 730.11 <br />The new contract net change sum $O.oo The new contract amendment sum ~55,13a.11 <br />The new contract sum including this change order will be $986,018.66 <br />Percents a of on final contract 5,gga,~ NET CHANGE DUE TO AMENDMENTS 8.99n/a <br />Approval by: <br />Clty Engineer Pnme Contractor Third Party <br />1 ~~~7 <br />Date Date ~ Date <br />CONTRACTOR ~ OFFICE FILE D PURCHASINGICR0 <br />Q:IPROJECT5IPROJ-514585 Bailey HiIIlCanstructionlChange OrderslChange Order 1.xls <br />. . I . <br />