Run Date: 11/12/2009 08:38:52 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 005 <br />Contractor: BABB CONSTRUCTION. <br />Job 93-003923 <br />Contract No: 2009-00027 <br />PO 2009100421 <br />Assessable: No <br />Original Contract: <br />Current Amount: <br />Contract Award Date: <br />Completion Date: <br />Current Contract <br />Line Description Last Chng Ord Unit Price Unit Measure Quantity <br />OLD COBURG RD TO CHAD DRIVE EXTENSION <br />General <br />Amount <br />Cumulative Totals <br />Quantity Amount <br />Page 2 <br />% Complete <br />0000 <br />0010 <br />0020 <br />Liquidated Damages <br />MOBILIZATION <br />TEMP. PROTECTION AND DIRECTION <br />($700.00) <br />$13,182.00 <br />$1,000.00 <br />DAY <br />LUMPSUM <br />LUMPSUM <br />0.000 <br />1.000 <br />1.000 <br />$0.00 <br />$13,182.00 <br />$1,000.00 <br />0.000 <br />0.000 <br />0.100 <br />$0.00 <br />$0.00 <br />$100.00 <br />0.000 <br />1.000 <br />1.000 <br />$0.00 <br />$13,182.00 <br />$1,000.00 <br />0.00 <br />100.00 <br />100.00 <br />0030 <br />0040 <br />0050 <br />TEMPORARY SIGNS <br />PROJECT INFORMATION SIGNS <br />FLAGGERS <br />$10.00 <br />$500.00 <br />$41.70 <br />SQFT <br />EACH <br />HOUR <br />250.000 <br />2.000 <br />150.000 <br />$2,500.00 <br />$1,000.00 <br />$6,255.00 <br />0.000 <br />0.000 <br />56.500 <br />$0.00 <br />$0.00 <br />$2,356.05 <br />129.000 <br />2.000 <br />120.000 <br />$1,290.00 <br />$1,000.00 <br />$5,004.00 <br />52.00 <br />100.00 <br />80.00 <br />0060 <br />0070 <br />0080 <br />TEMPORARY BARRICADES, TYPE III <br />EROSION CONTROL <br />CONSTRUCTION ENTRANCES <br />$40.00 <br />$500.00 <br />$300.00 <br />EACH <br />LUMPSUM <br />EACH <br />10.000 <br />1.000 <br />2.000 <br />$400.00 <br />$500.00 <br />$600.00 <br />0.000 <br />0.100 <br />0.000 <br />$0.00 <br />$50.00 <br />$0.00 <br />91000 <br />1.000 <br />1.000 <br />$360.00 <br />$500.00 <br />$300.00 <br />90.00 <br />100.00 <br />50.00 <br />0090 <br />0100 <br />0110 <br />INLET PROTECTION <br />BIO-FILTER BAG CHECK DAM <br />COMPOST FILTER BERM <br />$40.00 <br />$50.00 <br />$1.50 <br />EACH <br />EACH <br />FOOT <br />4.000 <br />6.000 <br />750.000 <br />$160.00 <br />$300.00 <br />$1,125.00 <br />0.000 <br />0.000 <br />0.000 <br />$0.00 <br />$0.00 <br />$0.00 <br />4.000 <br />4.000 <br />0.000 <br />$160.00 <br />$200.00 <br />$0.00 <br />100.00 <br />67.00 <br />0.00 <br />0120 <br />0130 <br />0140 <br />TEMPORARY TYPE ORANGE PLASTIC <br />CLEARING AND GRUBBING <br />TREE PROTECTION <br />$1.80 <br />$25,500.00 <br />$672.00 <br />FOOT <br />LUMPSUM <br />LUMPSUM <br />1,000.000 <br />1.000 <br />1.000 <br />$1,800.00 <br />$25,500.00 <br />$672.00 <br />0.000 <br />0.000 <br />0.000 <br />$0.00 <br />$0.00 <br />$0.00 <br />207.000 <br />1.000 <br />1.000 <br />$372.60 <br />$25,500.00 <br />$672.00 <br />21.00 <br />100.00 <br />100.00 <br />0150 <br />0160 <br />REMOVAL OF PIPES <br />TREE REMOVAL, 5" -24" DIA. <br />$10.00 <br />$300.00 <br />FOOT <br />EACH <br />258.000 <br />16.000 <br />$2,580.00 <br />$4,800.00 <br />0.000 <br />0.000 <br />$0.00 <br />$0.00 <br />499.500 <br />73.000 <br />$4,995.00 <br />$21,900.00 <br />194.00 <br />456.00 <br />0170 <br />0180 <br />0190 <br />0200 <br />REMOVAL OF SURFACINGS <br />ASPHALT PAVEMENT CUTTING <br />GENERAL EXCAVATION <br />6" SUBGRADE STABILIZATION <br />$3.00 <br />$2.00 <br />$5.44 <br />$12.00 <br />SQYD <br />FOOT <br />CUYD <br />SQYD <br />764.000 <br />438.000 <br />5,509.000 <br />200.000 <br />$2,292.00 <br />$876.00 <br />$29,968.96 <br />$2,400.00 <br />644.400 <br />194.000 <br />0.000 <br />0.000 <br />$1,933.20 <br />$388.00 <br />$0.00 <br />$0 <br />00 <br />1,321.500 <br />617.900 <br />4,069.000 <br />0 <br />000 <br />$3,964.50 <br />$1,235.80 <br />$22,135.36 <br />173.00 <br />141.00 <br />74.00 <br />0210 <br />SUBGRADE GEOTEXTILE <br />$0.60 <br />SQYD <br />8,932.000 <br />$5,359.20 <br />0.000 <br />. <br />$0.00 <br />. <br />10,149.300 <br />$0.00 <br />$6,089.58 <br />0.00 <br />114.00 <br />$916,940.18 <br />$920,989.42 <br />06/15/2009 <br />10/30/2009 <br />Amount <br />Estimated Payment <br />Quantity <br />