STANDARD SPECIFICATIONS <br />The 2008 Oregon Standard Specifications for Construction Volumes I and II (Oregon Specifications) as <br />issued in 2008, and the City of Eugene Standard Drawings, in effect as of January27,2009, both as revised <br />by Amendment #1 have been adopted as the Standard Specifications and Standard Drawings for the City of <br />Eugene in accordance with City Code section 7.085. Amendment #1 is hereby made a part of the Standard <br />Specifications and Standard Drawings of the City of.Eugene as fully and completely as if it were set forth <br />therein. The Standard Specifications, Standard Drawings and all Addenda may be examined at the <br />Engineering office located at 99 E. Broadway, Suite 400, Eugene OR 97401. <br />SUPPLEMENTAL SPECIFICATIONS <br />The section, subsection and drawing numbers of the Supplemental Specifications correlate to the section <br />and subsection numbers of the 2008 Oregon Standard Specifications and Standard Drawings. <br />00165.10(a) Materials Acceptance Guides- Field Tested Materials <br />(DELETE) At the end of the first sentence, "at the'discretion and frequency determined by the <br />Engineer" <br />(ADD) "pursuant to the Eugene Field tested Materials Assurance Guide (Eugene FTMAG). <br />Additional testing may be conducted as determined by the Engineer." <br />00165.10 Materials Acceptance Guides - Changes to the MFTP <br />Section 2: Quality Assurance Program <br />(DELETE) At the beginning of the second sentence of the first paragraph, delete the words "At the <br />Engineer's discretion,". <br />(DELETE) At the end of the last sentence of the first paragraph, delete the words "at the discretion <br />of the Engineer and at times and locations determined by the Engineer." <br />(ADD) At the end of the last sentence of the first paragraph, insert "pursuant to the Eugene <br />FTMAG. Additional testing may be conducted as determined by the Engineer." <br />(DELETE) Section 4(D): Field Tested Materials Guide. The entire paragraph in the Amendment. <br />(ADD) Section 5: Field Tested Materials Guide (Type D & E Projects) <br />Contractor shall comply with the requirements of Section 5 Quality Control for Type D <br />Projects. <br />Section 5: Field Tested Materials Guide (Type D & E Projects) <br />(DELETE) Delete the matrix* columns that reference "Quality Assurance by the Project Manager". <br />(ADD) Verification and assurance testing is pursuant to the Eugene FTMAG. <br />00165.30(c) Field Tested Materials - Acceptance of Field Tested Materials <br />(DELETE) In the second sentence, delete the words "at the frequency and discretion of the <br />Engineer" <br />(ADD) "pursuant to the Eugene FTMAG. Additional testing may be conducted as determined by <br />the Engineer." <br />Standard Specifications Page 1 <br />