New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4658 2010-00008 Knife River
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4658 2010-00008 Knife River
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:43:20 PM
Creation date
11/12/2009 3:21:37 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004658
GL_Project_Number
905094
Identification_Number
2010-00008
COE_Contract_Number
2010-00008
Retention_Destruction_Date
11/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STANDARD SPECIFICATIONS <br />The 2008 Oregon Standard Specifications for Construction Volumes I and II (Oregon Specifications) as <br />issued in 2008, and the City of Eugene Standard Drawings, in effect as of January27,2009, both as revised <br />by Amendment #1 have been adopted as the Standard Specifications and Standard Drawings for the City of <br />Eugene in accordance with City Code section 7.085. Amendment #1 is hereby made a part of the Standard <br />Specifications and Standard Drawings of the City of.Eugene as fully and completely as if it were set forth <br />therein. The Standard Specifications, Standard Drawings and all Addenda may be examined at the <br />Engineering office located at 99 E. Broadway, Suite 400, Eugene OR 97401. <br />SUPPLEMENTAL SPECIFICATIONS <br />The section, subsection and drawing numbers of the Supplemental Specifications correlate to the section <br />and subsection numbers of the 2008 Oregon Standard Specifications and Standard Drawings. <br />00165.10(a) Materials Acceptance Guides- Field Tested Materials <br />(DELETE) At the end of the first sentence, "at the'discretion and frequency determined by the <br />Engineer" <br />(ADD) "pursuant to the Eugene Field tested Materials Assurance Guide (Eugene FTMAG). <br />Additional testing may be conducted as determined by the Engineer." <br />00165.10 Materials Acceptance Guides - Changes to the MFTP <br />Section 2: Quality Assurance Program <br />(DELETE) At the beginning of the second sentence of the first paragraph, delete the words "At the <br />Engineer's discretion,". <br />(DELETE) At the end of the last sentence of the first paragraph, delete the words "at the discretion <br />of the Engineer and at times and locations determined by the Engineer." <br />(ADD) At the end of the last sentence of the first paragraph, insert "pursuant to the Eugene <br />FTMAG. Additional testing may be conducted as determined by the Engineer." <br />(DELETE) Section 4(D): Field Tested Materials Guide. The entire paragraph in the Amendment. <br />(ADD) Section 5: Field Tested Materials Guide (Type D & E Projects) <br />Contractor shall comply with the requirements of Section 5 Quality Control for Type D <br />Projects. <br />Section 5: Field Tested Materials Guide (Type D & E Projects) <br />(DELETE) Delete the matrix* columns that reference "Quality Assurance by the Project Manager". <br />(ADD) Verification and assurance testing is pursuant to the Eugene FTMAG. <br />00165.30(c) Field Tested Materials - Acceptance of Field Tested Materials <br />(DELETE) In the second sentence, delete the words "at the frequency and discretion of the <br />Engineer" <br />(ADD) "pursuant to the Eugene FTMAG. Additional testing may be conducted as determined by <br />the Engineer." <br />Standard Specifications Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.