New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4658 2010-00008 Knife River
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4658 2010-00008 Knife River
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:43:20 PM
Creation date
11/12/2009 3:21:37 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004658
GL_Project_Number
905094
Identification_Number
2010-00008
COE_Contract_Number
2010-00008
Retention_Destruction_Date
11/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br />PROPOSAL <br />OCTOBER 2, 2009, 2:00 P.M. <br />TO THE CITY MANAGER <br />EUGENE, OREGON <br />The undersigned Quoter declares: <br />JOB #4658 QUOTE NUMBER 27 <br />Morse Bros., Inc. dba Knife River <br />, QUOTER: <br />That Quoter has carefully examined and incorporates in this Proposal, by this reference all documents included <br />in the Book of Contract Documents and Specifications for this job which includes but is not limited to the Plans, City <br />Standard Specifications and Standard Drawings, Supplemental Specifications and Special Provisions, and City of Eugene <br />Amendment #1, Addenda, Quote Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for. <br />TRAFFIC CALMING <br />ON PRASLIN STREET, FILLMORE STREET AND EAST 32ND AVENUE <br />CAPITAL IMPROVEMENT PROJECT <br />That Quoter has made an examination of the site of the proposed work and has made such investigations as are <br />necessary to determine the character of the material and the conditions to be encountered, independently of the indication <br />on the plans; and that if the Proposal is accepted, Quoter will contract with the City of Eugene as provided in the Contract <br />Form, will to the extent of this quote, provide the necessary machinery, tools, apparatus, and other means of construction, <br />and will furnish all material and labor as specified, or called for by the Plans or necessary to complete the work in the <br />manner specified and in accordance with the requirements of the Engineer. <br />The undersigned also agrees that Quoter will order all material and equipment included under this contract and <br />will commence work within five (5) days after receipt of Notice to Proceed and that Quoter will complete the work in all <br />respects after commencement and will have the project completed as specified in the Special Provisions and that Quoter <br />will pay as liquidated damages to the City for any delay as specified in the Special Provisions: <br />PROPOSAL - JOB #4658 PAGE 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.