Run Date:. 11/04/2009 10:27:39 Page 2
<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> Payment No 003
<br /> Contractor: GELCO CONSTRUCTION Original Contract: $356,550.25
<br /> Job 93-004638 Current Amount: $426,394.33
<br /> Contract No: 2010-00004 Contract Award Date: 07/27/2009
<br /> PO Completion Date: 10/16/2009
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals ~ Complete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> 2009 WW REHAB PIPE REPLACEMENT
<br /> General
<br /> 0000 Liquidated Damages ($500.00) DAY 0.000'
<br /> $a,ao o.ooo $o.oo o.ooo $o.oD o.oo
<br /> 0010 MOBILIZATION $17,240.00 LUMPSUM 1.000 $17,240.00 0.000
<br /> $o.oo l.oao $17,z4o.oo 1ao.oo
<br /> 0020 TEMP. PROTECTION AND DIRECTION $5,000.00 LUMPSUM 1.000 $5,000.00 0.100 $500.00 1.000 $5,000.00 100.00
<br /> 0030 EROSION CONTROL $310.00 LUMPSUM 1.000
<br /> $310.00 0.000 $0.00 1.000 $310.00 100.00
<br /> 0040 HMAC TRENCH PATCH $282.00 TON 40.000
<br /> $11,280.00 3.140 $885.48 32.940 $9,289.08 82.00
<br /> 0050 ROCK SURFACING 3/4" MINUS $35.00 TON 200.000 $7,000.00 15.770 $551.95 154.270 $5,399.45 77.00.
<br /> 0060 CONCRETE 4 INCH $6.00 SQFT 25.000
<br /> $150.00 30.000 $180.00 30.000 $180.00 120.00
<br /> 0070 REINFORCED CONCRETE PVMT, 7 I $9.70 SQFT 4,585.000 $44,474.50 680.500 $6,600.85 5,718.000 $55,464.60 M 125.00
<br /> 0080 CONCRETE MH APRON $5.25 EACH 11.000
<br /> $57.75 5.000 $26.25 10.000 $52.50 91.00
<br /> 0090 CONCRETE MANHOLE, WW FLAT-TOP $2,110.00 EACH 2.000 $4,220.00 0.000 $0.00 2.000 $4,220.00 100.00
<br /> 0100 MINOR ADJUSTMENT OF MANHOLES $165.00 EACH 4.000 $660.00 2.000 $330.00 5.000 $825.00 125.00
<br /> 0110 CONNECTION TO EXISTING STRUCTU $900.00 EACH 22.000 $19,800.00 3.000 $2,700.00 22.000 $19,800.00 100.00
<br /> 0120 CONNECT TO EXISTING PIPE $246.00 EACH 3.000
<br /> $738.00 0.000 $0.00 3.000 $738.00 100.00
<br /> 0130 CONNECT TO EXISTING SERVICE LI $88.00 EACH 143.000
<br /> $12,584.00 17.000 $1,496.00 146.000 $12,848.00 102,00
<br /> 0140 REMOVAL OF AREA DRAIN $257.00 EACH 1.000
<br /> 5257.00 0.000 $o.oo l.ooD $z57.oo loo.oo
<br /> 0150 24" CONCRETE AREA DRAIN $800.00 EACH 1.000 $800.00 0.000
<br /> $o.oo l.ooo $soo.oo 100.00
<br /> 0160 6 INCH PVC WW SVC PIPE $45.00 FOOT 1,009.000 $45,405.00 134.500 $6,052.50 1,153.800 $51,921.00 M 114.00
<br /> 0170 S INCH PVC WW PIPE $30.00 FOOT 3,061.000 $91,830.00 0.000
<br /> $0.00 2,651.500 $79,545.00 M 87. 0
<br /> 0180 10 INCH PVC WN PIPE $48.00 FOOT 756.000
<br /> $36,288.00 110.000 $5,280.00 1,155.000 $55,440.00 153.00
<br />
<br /> 0190 18 INCH PVC WNT PIPE $82.00 FOOT 401.000 $32,882.00 401.000 $32,882.00 401.000 $32,882.00 100.00
<br />
<br /> 0200 DYE TEST AND CONNECTION VERIFI $200.00 EACH 102.000 $20,400.00 9.000 $1,800.00 112.000 $22,400.00 110.00
<br />
<br /> 0210 PLUG AND ABANDON PIPE $10.00 FOOT 14.000
<br /> $140.00 0.000 $0.00 13.000 $130.00 93.00