Run Date: 11/09/2009 09:58:34 Page 4
<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> Payment No 003
<br /> Contractor: WZLDISH CONST. Original Contract: $789,585.00
<br /> Job 93-004529 Current Amcunt: $805,085.00
<br /> Contract No: 2009-00025 Contract Award Date: 06/15/2009
<br /> PO 2009100411 Completion Date: 10/09/2009
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals ~ Complete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> 0410 FILLING ABANDONED PIPES $25.00 FOOT 24.000 $600.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0420 REMOVE WW HANGER PIPE AND MOUN $13.00 FOOT 414.000 $5,382.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0430 REMOVE WW COLLECTION BOX $2,400.00 LUMPSUM 1.000
<br /> $2,400.00 0.000 $0.00 0.000 $0.00 O.DO
<br /> 0440 12 INCH PVC WW PIPE $200.00 FOOT 411.000
<br /> $82,200.00 0.000 $0.00 0.000 $0.00 M 0.00
<br /> 0450 ASPHALT CONCRETE PAVEMENT REPA $80.00 CUYD 110.000
<br /> $8,800.00 6.900 $552.00 107.900 $8,632.00 98.00
<br /> 0460 PAVEMENT REMOVAL $4.00 SQFT 430.000 $1,720.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0470 CONCRETE GRINDING $10.00 SQFT 60.000 $600.00 -7.800 ($78.00) 33.400 $334.00 56.00
<br /> 0480 COLD PLANE PVMT REMOVAL, 2" DE $0.10 SQFT 225,000.000 $22,800.00 32,750.000 $3,275.00 235,250.000 $23,525.00 105.0
<br /> 0490 COLD PLANE PVMT REMOVAL, 4" DE $0.10 SQFT 36,500.000
<br /> $3,650.00 0.000 $0.00 37,044.000 $3,704.40 101.00
<br /> 0500 LEVEL 3, 1/2" DENSE HMAC $S1.o0 TON 4,250.000 $216,750.00 240.800 $12,280.80 3,906.550 $199,234.05 M 92.00
<br /> 0501 EXTRA WARM MIX ASPHALT (JOB 452 001 $2.50 TON 4,250.000 $10,625.00 240.800 $602.00 3,906.550 $9,766.38 92.00
<br /> 0510 CONCRETE CURBS $23.00 FOOT 43.000 $989.00 0.000 $0.00 251.200 $5,777.60 584.00
<br /> 0520 CONCRETE CURB AND GUTTER $34.00 FOOT 135.000
<br /> $4,590.00 0.000 $O.DO 53.300 $1,812.20 39.00
<br /> 0530 STANDARD CONCRETE GUTTER $30.00 FOOT 6.000 $180.00 0.000 $0.00 0.000 $0.00 0.00
<br />
<br /> .0540 CONCRETE WALKS $7.00 SQFT 1;620.000 $11,340.00 0.000 $0.00 1,516.100 $10,612.70 94.00
<br /> 0550 CONCRETE DRIVEWAYS, 7 INCH THI $13.00 SQFT 100.000 $1,300.00 0.000 $0.00 177.364 $2,305.73 177.00
<br /> 0560 TRUNCATED DOME TEXTURING $25.00 SQFT 84.000 $2,100.00 0.000 $0.00 80.000 $2,000.00 95.00
<br /> 0570 PVMT LEGEND, TYPE A: ARROWS ~ $125.00 EACH 35.000
<br /> $4,375.00 0.000 $0.00 38.000 $4,750.00 .109.00
<br /> 0560 PVMT LEGEND, TYPE A: BICYCLE L $200.00 EACH 2.000 $400.00 0.000 $0.00 2.000 $400.00 100.00
<br /> 0590 PVMT LINE, TYPE A OR B $4.50 SQFT 4,112.000 $18,504.00 -1.400 ($6.30) 4,002.200 $18,009.90 97.00
<br /> 0600 THERMOPLASTIC, NON-PROFILE, 90 ~ $12,000.00 LUMPSUM 1.000 $12,000.00 0.000 $0.00 1.000 $12,000.00 100.00
<br /> 0610 MONO-DIRECTIONAL CRYSTAL TYPE $5.00 EACH 434.000
<br /> $2,170.00 0.000 $0.00 368.000 $1,840.00 85.00
<br /> 0620 CONDUIT UNDER HARD SURFACING $60.00 FOOT 30.000
<br /> $1,eao.oo o.ooo $o.oo la.ooo $l,Deo.oo 60.00
<br /> 0630 JUNCTION BOX, TYPE 2 $550.00 EACH 2.000 $1,100.00 0.000 $0.00 2.000 $1,100.00 100.00