Run Date: 11/09/2009 09:36:53 Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: EUGENE SAND CONSTRUCTION Original Contract: $56,208.50 <br /> Job 93-004612 Current Amount: $56,208.50 <br /> Contract No: 2010-00005 Contract Award Date: 08/19/2009 <br /> PO 2010100088 Completion Date: 09/25/2009 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> ALTON BARER PR LOT B ACCfiSS LOCATOR <br /> General <br /> 0000 Liquidated Damages ($200.00) DAY 0.000 $0,00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $3,700.00 LUMPSUM 1.000 $3,700.00 0.000 <br /> $o.oo l.ooo $3,700.00 loo.Do <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $900.00 LUMPSUM 1.000 $900.00 0.000 $0 00 1 000 $900 00 100 00 <br /> 0030 EROSION CONTROL $900.00 LUMPSUM 1.000 $900.00 0.000 $0.00 1.000 $900.00 100.00 <br /> 0040 CLEAR/ GRUB, REMOVE SURFACING, $5,800.00 LUMPSUM 1.000 $5,800.00 0.000 $0.00 1.000 $5,800.00 M 100.00 <br /> 0050 EMBANKMENT IN PLACE $18.00 CUYD 175.000 $3,150.00 0.000 $0.00 79.030 $1,422.54 45.00 <br /> 0060 3/4" AGGREGATE BASE $21.00 TON 201.000 $4,221.00 0.000 $0.00 256.000 $5,376.00 127.00 <br /> 0070 PLAIN CONCRETE PVMT, UNDOWELED $5.00 SQFT 502.000 $2,510.00 0.000 $0.00 606.000 $3,030.00 121.00 <br /> 0080 LEVEL 1 HNAC $86.00 TON 73.000 $6,278.00 0.000 $0.00 73.000 $6,278.00 M 100.00 <br /> 0090 AGGREGATE SHOULDERS $50.00 TON 15.000 $750.00 0.000 $0.00 15.500 $775.00 103,00 <br /> 0100 PAVEMENT LINE REMOVAL $4.50 FT 287.000 $1,291.50 0.000 $0.00 348.000 $1,566.00 121.00 <br /> 0110 DRAINAGE GfiOTBRTILE $1.05 SQYD 240.000 $252.00 0.000 $0.00 330.000 $346.50 138.00 <br /> 0120 GRANULAR DRAINAGE BLANKET $28.00 TON 145.000 $4,060.00 0.000 $0.00 91.000 $2,548.00 63.00 <br /> 0130 TOPSOIL $22.00 CUYD 220.000 <br /> $4,840.00 0.000 $0.00 210.000 $4,620.00 95.00 <br /> 0140 IRRIGATION SYSTEM $5,000.00 LUMPSUM 1.000 $S,O00.o0 0.000 $0.00 0.967 $4,835.00 97.00- <br /> 0150 PLANTING AREA PREPARATION $0.40 SQFT 2,750:000 $1,100.00 0.000 $0.00 2,750.000 $1,100.00 100.00 <br /> 0160 DECIDUOUS TREES, 2" $190.00 EACH- 7.000 $1,330.00 0.000 <br /> $0.00 7.000 $1,330.00 100.00 <br /> 0170 SHRUBS, 3 GALLON $15.00 EACH 185.000 $2,775.00 0.000 $0.00 179.000 $2,685.00 97.00 <br /> <br /> ,0180 SHRUBS, 1 GALLON $8.00 EACH 295.000 $2,360.00 0.000 $0.00 288.000 $2,304.00 98.00 <br /> 0190. MULCH $35.00 CUYD 21.000 $735.00 0.000 $0.00 30.000 $1,050.00 143.00 <br /> 0200 ROCK MULCH $25.00 CUYD 10.000 $250.00 0.000 $0.00 11.000 $275.00 110.00 <br /> 0210 PERMANENT SEEDING $0.35 SQFT 2,360.000 $826.00 0.000 $0.00 1,510.000 $528.50 64.00 <br /> <br />