New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4658 Beg Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4658 Beg Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:43:37 PM
Creation date
11/10/2009 10:34:17 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004658
GL_Project_Number
905094
COE_Contract_Number
2010-00008
Retention_Destruction_Date
11/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works <br /> Completion Dates for Contract Projects Eng?neering <br /> City of Eugene <br /> 99 E. Broadway, #400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> DATE CONTRACT NO. <br /> 11/4/2009 2010-08 <br /> PROJECT NAME JOB NO. <br /> Traffic Calming on Praslin St, Fillmore St, and E 32"d Ave. 4658 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Knife River <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Josh Christiansen 501-0385 40/20/09 <br /> FIRST NOTIFICATION <br /> 10/26/0915 THE DATE ON WHICH THE CONTRACT WORK BEGAN: Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (fROM SECT: 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> ALL CLAIMS FOR ADDITIONAL C.OMPENSATiON MUST BE SUBMITTED BY: <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS:) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 10/28/091S THE DATE ON WHICH ALL CONTRACT WORK WAS. COMPLETED, INCLUDING CORRECTIVE WORK,' EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS. AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD.. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN IN EFFECT FOR THE. DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR 18 RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT COME "EVIDENT <br /> WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR RF~TY RI~DaIVILL <br /> 8~` <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE- REPAIR: ~ i } . <br /> ~ ~ t <br /> h ' r Signature <br /> For Privately Engineered Projects Only <br /> Engineer:- <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager' File winger Perales, PVUM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> POS Maintenance-Planning Surety ~ PW Administration PIC Engineering PWE As Construct Monitor MADDBupervisorlnspector <br /> <br /> Q:\PROJECTS\PROJ-8\4658 traffic calming nlimore, E 32nd, praslin\Correspondence\Contractors\4658 Third Notification.doc March Zoos <br /> k~7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.