Final Acceptance Pubr~works <br /> .Completion of Warranty Period Engineerit,g <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> (541) 682-8410 <br /> To: Delta Sand & Gravel Date:. October 27, 2009 <br /> 999 Division Ave <br /> Eugene, OR 97404 From: Josh Pinkham <br /> Project: U of O Baseball Storm Drain Improvements <br /> Contract Number:. 2009-502 Job Number. 4575 <br /> A warranty inspection has: been made on this project in accordance with Section 00150 of .the <br /> .City Standard Specifications.. and. Standard Drawings... <br /> No defects were noted and/or were .corrected- the project is hereby, accepted by the City :for. <br /> permanent maintenance: <br /> FOR PRNATELY ENGINEERED PROJECTS ONLY <br /> Engineer. Balzhiser& Hubbard.Engineers <br /> Address: 100 W 13"' Ave <br /> Eugene, OR 97401 <br /> Owner. Rose DeBono <br /> Address: 1295-Franklin Blvd <br /> Eugene, OR 97403 <br /> <br /> Q:\PROJECTS\PROJ-S\4575\Correspondence\Contractors\4575 20091027 Final Acceptance Completion of Warranty Period:doc <br /> ENG 1122 Contractor File Engineer- Owner Surety PW Admin Construction Manager Revised 4/04 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br /> <br />