New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4402 10 MONTH WARRANTY INSPECTIONKBK
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4402 10 MONTH WARRANTY INSPECTIONKBK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 4:30:52 PM
Creation date
11/5/2009 8:19:21 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004402
GL_Project_Number
975102
COE_Contract_Number
2009-00002
Retention_Destruction_Date
2/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ïð Ó±²¬¸ É¿®®¿²¬§ ײ°»½¬·±² <br />The project listed below will satisfy itsone year warrantyobligation in the next 60 days. Please <br />provide a warranty inspection on the project. <br />It is the intent of this e-mail to coordinate the inspection efforts of the PWE and PWM staff on all <br />Capitol Improvement Plan (CIP) projectsand Privately Engineered Public Improvement (PEPI) <br />projects prior to the expiration of the one year warranty period. In general, the role of the PWM <br />Staff will be to provide expertise, advice, and assistance to the PWE Staff by performing a final <br />inspection of the below listed project within the next four (4) weeks. It is the responsibility of the <br />PWMsupervisors to e-mail deficiencies to the inspector initiating this e-mail. It is the <br />responsibility of the inspector to compile all deficiencies and review them with the Construction <br />Manager prior to contacting the prime contractor. If you do not respond to this e-mail within four <br />weeks we will assume you found no deficiencies. <br />At the time of this request it is the responsibility of the PWE inspector to provide to PWM a <br />usable cover sheet, in a size appropriate to the scope of the project, with the infrastructure <br />numbers and locations indicated when lines are to be tv’d. <br />The job number isno longer active and is listed as a reference number only. <br />Responsibility for administering the project and enforcing project requirements remains with the <br />PWE Staff and all communication with the contractor will go through the project inspector who <br />initiated this e-mail or through the PWE Construction Managers. <br />Please call if you have any questions. <br />: <br />Ö±¾ Ò¿³» <br />Ử¬¿ п®µ <br />:: <br />ݱ²¬®¿½¬ Ò«³¾»®Ö±¾ Ò«³¾»® <br />îððçóðîììðî <br />: <br />Ѳ» Ç»¿® É¿®®¿²¬§ É·´´ Û¨°·®» Ѳ <br />ïîñðçñîððç <br />: <br />ݱ²¬®¿½¬±® <br />ͽ±¬¬ Þ®±©² ݱ²¬®«½¬·±² <br />: <br />ײ°»½¬±® ú и±²» Ò«³¾»® <br />Õ¿®´ Õ®»«¬¦»® øëìï÷ êëìóðèðè <br />: <br />Ю±¶»½¬ ú Ü»½®·°¬·±² <br />LandscapeStorm DrainWastewaterCurb & Gutter <br />SidewalkHMACErosion ControlIllumination <br />Traffic SignalsPermanent SignsPermanent Striping <br />Mechanical Storm Water FacilityVegetated Storm Water Facility <br />Other Playground Equipment, Site Furnishings, Irrigation System <br />Q:\PROJECTS\PROJ-2\4402\Correspondence\Other\PWM\4402-2009110410 MONTH WARRANTY INSPECTIONKBK.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.