New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4585 CPM CO#1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
09 Street Bond Audit
>
GJN4585
>
GJN4585 CPM CO#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2011 3:31:49 PM
Creation date
11/4/2009 1:22:50 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004585
GL_Project_Number
995374
COE_Contract_Number
2009-00020
Retention_Destruction_Date
2/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY DF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGWEERING DIVISION <br /> Change Order Job# 4585 <br /> Contrac# # 20D9-0002A <br /> CONTRACTOR: GPM Development Gorporation Change Order # 1 <br /> (ADDRESS) dba Egge Sand & Gravel Date: 10122109 <br /> PO Box 1067 GAMS Date: <br /> Eugene, OR 97440 <br /> Reviewed by: pate; <br /> PROJECT; Pavin Bond Measure - Baile Hill Raad From W.18th Avenue Inspector: R. Remmers <br /> to Bertelsen Road <br /> Praj. Mgr. S. Milovich S <br /> Principal Eng. M. Cahill <br /> <br /> You are directed to make the fallowing changes in this contract: <br /> Contract <br /> Item <br /> Na. <br /> 540 Portable Chan eable Messa a Board <br /> 550 Pa er Joints Install & Remove <br /> 400 Laa Detectors Installation <br /> 410 Audible Pedestrian Device Com lete <br /> 420 Street Li hts Com lete <br /> 5fi0 Install RRFB <br /> 570 Over Excavation & Stabilization <br /> 580 Concrete Remove & Re lace <br /> This changes the bid items as follows; <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Change (Units Cost Amount ~+1-] Change Change <br /> 540 Portable Changeable Message Board Ori final 0.00 0.00 0.00 $0.00 <br /> Revised D.DO o.DO DAa <br /> Amended 1.00 LS $1842,75 $1842.75 $1842J5 <br /> 550 Paper Joints Install & Remove Ori final 0.00 0.00 0.00 $0,00 <br /> Revised O.DO OA0 DAD <br /> Amended 1.00 LS $15 224.51 $15 224.51 $15 224.51 <br /> 400 Laop Detectors Installation Ori final i.00 LS 19 o00AD 19 DOO.OD $1,065.00 <br /> Revised 1.00 LS 20 065A0 ZO 065.OD <br /> Amended D.oo $D.DD $o.oD $o.Do <br /> 410 Audible Pedestrian Device Complete Ori final 1.00 LS 10 000.00 10 000.00 $2,477.00 <br /> Revised 1.00 LS iZ 477.00 12 477.00 <br /> Amended 0.00 $0.00 $D.00 $0.00 <br /> 420 Street Lights Complete Ori final 1.00 LS 24 200AD 24 20D.00 $13,832.33 <br /> Revised 1.00 L5 38 032.33 38 032.33 <br /> Amended D.00 $O.OD $0,00 $0.00 <br /> 560 Install RRFB Ori ina) 0.00 OAO D.OD $0.00 <br /> Revised 0,00 0.00 O.OD <br /> Amended 1,00 L5 $12 499.00 $12 499.OD $12 499.00 <br /> 570 Over-Excavation & Stabilization Ori final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 DAO D.OD <br /> Amended 1.00 L5 $5 634AD $5 634.OD $5 634.D0 <br /> 580 Concrete Remove and Replace Ori final D.00 0.00 0.00 $O.OD <br /> Revised D.DD D.Da D,oa <br /> Amended 1.00 L5 $3156.12 $3156.12 $3156.12 <br /> The original contract work days are o.o da s <br /> The contract time change this C.0 0.o da s <br /> The contract time change by previous C.O.'s o.o da s <br /> The new contract work da s are D.o da s <br /> The original contract sum was $93D,z87.95 <br /> Net change by previous change order $D.oo <br /> Net change due to amendment by previous change order $D.oo <br /> The contract sum prior to this change order was $930,287.95 <br /> This change order will change contract sum by this amount $55,730.71 <br /> The new contract net change sum $17,374.33 <br /> The new contract amendment sum ~3s,s5s.~s <br /> The new contract sum including this change order will be 986 018.66 <br /> Percenta a of ari final contract 5.99~h <br /> NET CfiANGE DUE TO AMENDMENTS 4.12% <br /> Approval by; <br /> City Engineer Prime Contractor Third Party <br /> 1 l~ <br /> Date Date Date <br /> CONTRACTOR ~ OFFICE FILE D PURCHASINGICRO <br /> Q:IPROJECTSIPROJ-514585 Bailey HiIIlConstructionlChange OrderslChange Order 1.xls <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.