New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4570 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4570 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:24:39 AM
Creation date
10/30/2009 1:45:01 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004570
GL_Project_Number
374570
COE_Contract_Number
2010-00504
Retention_Destruction_Date
10/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and. <br /> Public Works <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 99 E. Broadway, #400 <br /> .Eugene, OR 97401 <br /> (541)' 682-5291 <br /> DATE CONTRACT NO. <br /> 10/29/2009 <br /> 2010-0504 <br /> PROJECT NAME JOB NO: <br /> Lester Avenue W W Extension 4570 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> EggeSand & Gravel N/A <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Kris-0Ison 541 682-5249 N/A <br /> FIRST NOTIFICATION <br /> 9/21/09 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN.. Inspector Sigrature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180:50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> N/A WA 10/15/2009. <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 10/29/2009 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACTPROVISIONSFQR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION- <br /> Notice of Completion. Begin Warranty Period. <br /> 10/29/2009 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND- <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OFALL-CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT.' THIRD NOTIFICATION-INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD:. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br /> WITHIN THE ONE-YEAR WARRANTY PERIOD: REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR ~ PERIOD WILL BE <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR; <br /> Spector Signature.... <br /> For Privately Engineered Projects Only . <br /> Engineer: Poage Engineering & Sureying; Inc <br /> Address: PO Box 2527 <br /> Eugene, OR 97402 <br /> Owner: Jason & Kristen Wolf <br /> Address: 850 Beacon Drive <br /> Eugene, OR 97404 <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION; <br /> Contractor Engineer Owner Construction Manager ~ File Ginger Perales; PWM <br /> ADDITIONAL-DISTRIBUTION FOR THIRD NOTIFICATION: <br /> POS Maintenance-Planning Surety. PW Administration PIC Engineering PW E As Construct Monitor MADD Supe[visor Inspector <br /> Q:IPROJECTS\PROJ-0\4570\Correspondence\Contractors\4570-20091029ThirdNoteKDO.doc <br /> <br /> 4 March 2009 ~ nd1, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.