New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4590 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4590 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:36:39 AM
Creation date
10/30/2009 1:45:01 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004590
GL_Project_Number
995462
COE_Contract_Number
2009-00017
Retention_Destruction_Date
10/29/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notificatjon of Commencement -and <br /> <br /> ' Public Works <br /> COf7lpjetl0n ~ateS 'f01" COntl'aCt Pt'OJeCtS Engineering <br /> City of Eugene <br /> 99 E. Broadway, #400 <br /> Eugene, OR 97401 <br /> (541)682-5291 <br /> DATE CONTRACT NQ <br /> 10/29/2009 2009-17 <br /> PROJECT NAME JOB NO. <br /> Terminal Ramp Reconstruction Section 2 4590 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Wildish Construction 3-41-0048-42&43 - <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Daniel Durazo 541-682-2680 Aril 10,2009 <br /> FIRST NOTIFICATION <br /> 05/06/20091S THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION. <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT: 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED. COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 09/19/09 09/19/09 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 10/10/09 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> October 11,2009 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR fOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN RK THAT E EVIDENT <br /> WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEA RRAN P 10 WILL BE <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. r <br /> Inspector Signat <br /> for Privately Engineered Projec#s .Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Managerl~~ File Ginger Peral'es, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> POS Maintenance-Planning Surety PW Administratio[t,._ PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> Q:\PROJECTS\PROJ-0\4590 Terminal Rarnp 2\Correspondence\Contractors\4590_20090921 THIRDNOTE_DD.doc Marcn 2009 a <br /> C~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.