New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4612 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4612 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:17:01 PM
Creation date
10/30/2009 1:45:00 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004612
GL_Project_Number
995532
Retention_Destruction_Date
3/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works <br /> <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 99 E. Broadway, #400 <br /> Eugene, OR 97401. <br /> (541) 682-5291 <br /> DATE CONTRACT NO. <br /> 10/16/2009 2010-05 <br /> PROJECT NAME ~ JOB N0. <br /> Alton Baker Park Lot 8 Access Drive at Leo Hams Parkway 2 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Eugene Sand and Gravel <br /> INSPECTOR PHONE NUMBER DATE OF AWARD ' <br /> Karl Kreutzer 682-8466 8/19/2009 <br /> FIRST NOTIFICATION. <br /> 8/19/2009;IS THE DATE ON WHICH 11iE CONTRACT WORK BEGAN, ~ Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE {S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED 'COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> Functional Driveway 9/4/2009 0 9/4/2009 <br /> All work with exception of Plant Est. 9/25/2009 0 g/25/20pg <br /> Plant Establishment Period 9/29/2010 - <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 10/23/2009 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Ins ' or Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 10/15/2009 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDERTHE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEARWARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'& NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THA EC E EVIDENT <br /> WITHIN THEONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE <br /> YEAR WIL <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> Ins Signa re <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager ~ File Ginger Perales, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> POS Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.