New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4665 Engineering & Const Agree
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4665 Engineering & Const Agree
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:48:30 PM
Creation date
10/30/2009 1:45:00 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004665
GL_Project_Number
374665
COE_Contract_Number
2011-00504
Retention_Destruction_Date
11/15/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works <br /> Engineering and Construction Agreement Engineering <br /> a. <br /> City of Eugene <br /> Job # L_~~ Contract # Capital Project # 99 E. Broadway, Suite 400 <br /> Eugene, Oregon 97401 <br /> {541)682-5291 <br /> {541) 682-5032 FAX <br /> The undersigned Owner requests the Public Improvements as described below: <br /> Type of Improvement: Paving. Stormwater. Wastewater (manhole adjustments) Traffic Signals Street lights <br /> (Paving, wastewater, stonmvater, street lights) <br /> location: University District - UO Arena PEPI 2 - {8 small sites} <br /> (Street or easement. If a subdivision, print subdivision name) <br /> North or east limit: Franklin Boulevard South or west limit; 15"' Avenue <br /> (Except for subdivisions) (Excep! forsubdivlsions) <br /> be designed and constructed during the 2010 or subsequentconstruction season in the following manner {check one): <br /> (Year) <br /> ? 1. Qs a City engineered and constructed project (eligible for assessment financing). <br /> City agrees: <br /> a} to perform engineering design, cost estimate, award of contract, construction inspection, and assessment tabulation for the <br /> improvements; <br /> b) to participate in Ehe cost of necessary additional capacity of improvements beyond the assessable amounts as stipulated in <br /> the~Eugene Municipal Code. <br /> Owner agrees: <br /> a) to pay all engineering and construction ousts which are not eligible for assessment financing, <br /> b) If the undersigned owner chooses to discontinue the City engineering and construction process prior to execution of a <br /> construction contract, the owner further agrees to pay ail engineering and other project-related costs incurred by the City io <br /> that point, and to comply with paragraph 2 below, if applicable. <br /> ® 2. As a privately engineered and constructed project with private financing arranged by the Owner. • <br /> Owner agrees: <br /> a) to install a!1 required public improvements ai no cost to the City; <br /> b) to pay actual City costs incurred for plan review and processing, inspection, materials testing, and. other engineering <br /> services, all of which will be billed and payable monthly with final payment due prior to' City's final acceptance of the <br /> completed improvements. <br /> c) to provide the City a bond, which includes cone-year warranty period, in an amount sufficient to cover all engineering and <br /> construction costs associated with completion of the required public improvements. <br /> d) to pay other charges and levies for public improvements, if required. Other charges may include, but are not limited to: <br /> 1) penalty charges: in the event the property owner fails to make payment when due under this agreement, the property <br /> owner shall 6e charged a penalty in the amount of $25 or ten percent (10%) of the past due amount, whichever is <br /> greater. Payment of the penalty shall not constitute a waiver by the City of its other remedies. <br /> 2) interest charges: property owner shall pay interest on all past due amounts at fhe rate of eighkeen percent (18%) per <br /> annum from the due date until paid. This sum shall be in addition to penalty charges. <br /> PROP^ERTY OWNER GO-OWNER CITY OF EUGENE <br /> ( <br /> PERTYOWNER'S SIGNATURE CO-OWNER'S SIGNATURE SI ATURE <br /> ~ JL~ <br /> ~~I <br /> PROPERTY OWNER'S NAME CO-OWNER'S NAME TITLE <br /> DATE DATE ATE <br /> <br /> ~zgS ~~atn/~~i>., i3?i~~ <br /> ADDRESS ADDRESS 101 E BROADWAY, SUITE 400 <br /> ,~i,.e,~,~-~ ~~R.-- ~ ~~In3 <br /> EUGENE OREGON 87401 <br /> CITY I TATE,//ZI}P CITY J STATE / 21P <br /> 3 `1 ~--2'~ dj Z ONgina(to the City of Eugene <br /> PHONE NUMBER business hours Copies to Owner Co-Owner end inspector <br /> ( ) PHONE NUMBER (business hours) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.