Page 53 of 93 <br /> ¦ Review and possibly update the trip generation and trip distribution <br /> submodels if household survey data are ready. Update the transit <br /> networks and the mode choice model. <br /> ¦ Calibrate the model <br /> ¦ Compute performance measures. <br /> 'Products Year 2 <br /> ? Calibrated base year 2008 model <br /> ? Future 2035 model <br /> ? Performance measures report <br /> 8. Functional Classification Update <br /> Review and update the federal functional classification of all roads within <br /> the MPO area. <br /> Tasks Year 2 <br /> ¦ Produce maps showing current functional classifications and daily auto <br /> volumes. <br /> ¦ Coordinate with local public works staff to determine changes <br /> ¦ Coordinate with ODOT staff to create list of updates. Create maps and <br /> GIS shape files to transmit updates to ODOT. ODOT coordinates with <br /> FHWA. <br /> ¦ Update functional classification data base when final approval is obtained <br /> for changes. <br /> 'Products Year 2 <br /> ? GIS database of current road network with federal functional <br /> classifications <br /> 9. Bike Model (Phase 1) <br /> ' Metro and PSU are developing a bicycle model based on the <br /> characteristics of routes preferred by bicyclists. The model will assist in <br /> planning for new routes and for upgrading existing routes to make them <br /> `more attractive to potential users. The information will also be used to <br /> 'upgrade the mode choice model for a more robust estimation of bicycle <br /> trips. This model will be transitioned to the Central Lane MPO area for <br /> use in our bicycleplanning efforts. <br /> Tasks Year 2 <br /> ' ¦ Coordinate with Metro/PSU and obtain documentation and model <br /> specifications. <br /> ¦ Develop model software and required data sets at MPO. <br /> ¦ Exercise and validate the model <br /> ¦ Prepare for future work in'FY 2012 and beyond to develop bicycle <br /> network link propensity functions fore route choice and to recalibrate the <br /> mode choice model for use in examining the existing bike network and <br /> developing' improvement recommendations. <br /> <br /> Central Lane. MPO Unified Planning Work Program FY 2010 and 2011 <br /> <br />