New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4560 3rd Notice Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4560 3rd Notice Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:49:37 AM
Creation date
10/16/2009 1:49:25 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004560
GL_Project_Number
985394
COE_Contract_Number
2009-00016
Retention_Destruction_Date
10/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement''and Public works <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 99 E. Broadway, #400 <br /> " Eugene, OR 97409 <br /> (541) 682-5291 <br /> DATE CONTRACT N0. <br /> 10/7/09 2009-16 <br /> PROJECT NAME JOB NO. <br /> PPP Royal Ave. 4560 <br /> CONTRACTOR. FEDERAL AID PROJECT NO. <br /> Eugene Sand and Gravel <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Charles Heath 682-5522 4/16/09 <br /> FIRST NOTIFICATION <br /> 5/04/09 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. - Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED ~ COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 7/03/09 0 6/24/09 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 7/15/09 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 9/16/09 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK; EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE' STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE . <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN W EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br /> WITHIN THE ONE-YEAR"WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR WARRANTY PERIOD WILL BE <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> Ins or Signature <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: . <br /> Address: <br /> DISTRIBUTION FOR FIRST; SECOND, AND THIRD NOTIFICATION: _ <br /> Contractor Engineer Owner .Construction Manager File Ginger PeYales, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION:. <br /> POS Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monftor MADD Supervisor Inspector ~ , <br /> ~ef~ ~i <br /> <br /> Q:\PROJECTS\PROJ-0\.4560\Correspondence\Contractors\4560-20091008-and No#ification.docx March Zoos <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.