New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4348 3rd Notice Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4348 3rd Notice Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:22:31 PM
Creation date
10/16/2009 1:49:25 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004348
GL_Project_Number
965534
COE_Contract_Number
2009-00016
Retention_Destruction_Date
10/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and . <br /> Public Works <br /> Completion. Dates for Contract; Projects Engineering <br /> City of Eugene <br /> 99 E. Broadway, #400 <br /> Eugene, OR 97401 <br /> • (541) 682-5291 <br /> DATE CONTRACT NO. <br /> 10/7/2009 2009-16 <br /> PROJECT NAME JOB NO. <br /> PPP Danebo 4348 ' <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Eugene Sand and Gravel <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Charles Heath 682-5522 3/31/09 <br /> FIRST NOTIFICATION <br /> 4/27/091S THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 7/03/09 0 6/12/09 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 7/02109 <br /> (SEE SUBSECTION 00199.30.0E THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 9/16/09 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENTAND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR.. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br /> WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR W NTY PERIOD WIL <br /> REQUIRED TO BE GUARANTEED. FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> Inspector Sig . <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File Ginger Perales, PWM <br /> <br /> \Q ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> POS Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector. <br /> N~ <br /> Q:\PROJECTS\PROJ-844348\Correspondence\Contractors\4348-20091007-3rd Notifcation.docx March Zoos ~h <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.