.Final Acceptance Pubrcworks <br /> Completion of Warranty Period Engineering <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> (541) 682-8410 <br /> To: Chris Spellman Date: October 7, 2009 <br /> Knife River-Western Oregon Division <br /> 1001 Division Ave. From: Daniel Durazo <br /> Eugene, OR 97404 <br /> .Project: 2008 Rehabilitation South Ramp <br /> Contract Number.. 2008-26 Job Number: 4530 <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> ----°-------°-----~--~--FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer: <br /> Address: <br /> Owner. <br /> Address: <br /> <br /> Q:\PROJECTS\PROJ-0\4530\Correspondence\Contractors\4530-20091007-Final Acceptance Completion of Wairanty Period.doe <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager _ Revised 4/04 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br /> <br />