New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4594 3rd Notice Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4594 3rd Notice Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:41:03 AM
Creation date
10/16/2009 1:49:25 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004594
GL_Project_Number
995265
COE_Contract_Number
2009-00024
Retention_Destruction_Date
2/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fVotification of Commencement and <br /> Public Works <br /> Completion Dates for Contract Projects: Engineering <br /> City of Eugene <br /> - 99 E. Broadway, #400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> DATE CONTRACT NO. <br /> 10/9/2009 <br /> 2009-24 <br /> PROJECT NAME JOB NO. <br /> 20091Nastewater Rehabilitation Point Repair Project 4594 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> H & J Construction <br /> "INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Karl Kretrtzer 541-682-8466 6/49/20 <br /> FIRST NOTIFICATION <br /> July 8"' 2009 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. sped Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) .DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 9/18/2009 N/A 9/14%2009 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 9/21/2009 . <br /> (SEE SUBSECTION 00499.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspect Sig re <br /> THIRD NOTIFICATION _ _ _ <br /> Notice of Completion. Begin Warranty Period. <br /> 10/9/2009 }S THE DATE ON WHICH ALL CONTRACT WORK WAS COMPL)=TED, INCLUDING CORRECTIV)=WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALLCERTIFICATIONS, BILLS.AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD: <br /> IN ACCORDANCE WITH SECTION 00470 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR. FOR-ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF 1NORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN iN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANIYIF GREATER THAN THE REQUIRED ONE YEAR. . <br /> -THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS iN WORK THAT CO EVIDENT <br /> WITHIN THE ONE-YEAR WARRANTY"PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE.ONE-YEAR f <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR. FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> ign e <br /> For Privately Engineered" Projects Only <br /> Engineer: . <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR fIRST, SECOND, AND THIRD NOTIFICATION; <br /> Contractor Engineer Owner Construction Manager File Ginger Perales, PW M <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> POS Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor. MADDSupervisor Inspector <br /> <br /> O:~PROJECTS\PROJ-4\4594.08 WW Rehab Phase III\Correspondence\Cpntractors\4594-20091008KBKThird Notification.doc March 2009 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.