New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4592 Warranty 3rd Notice
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4592 Warranty 3rd Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:39:05 AM
Creation date
10/16/2009 1:49:25 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004592
GL_Project_Number
995444
COE_Contract_Number
2009-00022
Retention_Destruction_Date
10/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> ' Pwblic Works <br /> Completion Dates for .Contract Projects Engineering. <br /> City of Eugene <br /> 99 E. Broadway; #400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> DATE CONTRACT NO. <br /> 9/30/2009 09-22 <br /> PROJECT NAME JOB NO. <br /> 2009 PPP Slurry Seal 4592 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Valley Slurry Seal. <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> - Josh Pinkham 541 682-8473 06/17/2009 <br /> FIRST NOTIFICATION <br /> 06/29/2009 IS TH.E DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature- <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS' SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION. <br /> 09/18/09 0 08/03/09 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 08/25/09 <br /> (SEE SUBSECTION 00499.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> ..Notice of.Completion. Begin Warranty Period. <br /> 09/29/09 IS THE DATE ON WHICH ACL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS. <br /> REQUIRED UNDER THE CONTRACT: THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD.. <br /> IN ACCORDANCE WITH SECTION 001.70 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> ..REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br /> WITHIN THE ONE-YEAR. WARRANTY PERIOD. REPAIRS OR REPLACEMENTS-MADE WITHIN THE ONE-YEAR WAR P IOD WILL BE <br /> REQUIRED TO BE GUARANTEED FOR'ONE YEAR. FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> Inspector Signature <br /> For Privately Engineered Projects Only. <br /> Engineer: <br /> Address <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST; SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction. Manager _ File Ginger Perales, PWM <br /> ADDITIONAL DISTRIBUTION-FOR THIRD NOTIFICATION: <br /> POS Maintenance-Planning Surety PW Administration PIC Engineering PWE As Coristruct Monitor MADD Supervisor Inspector <br /> <br /> Q:\PROJECTS\PROJ-2\4592\Correspondence\Contractors\4592-20090930 ThirdNotificafion.doc March Zoos <br /> r <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.