New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4650 Warranty 2nd Notice
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4650 Warranty 2nd Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:40:17 PM
Creation date
10/16/2009 1:49:25 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004650
GL_Project_Number
374650
COE_Contract_Number
2010-00502
Retention_Destruction_Date
8/18/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencemelnt and - <br /> Public Works ` <br /> Completion Dates for Contract Projects. Etg;r,ee~ng <br /> City of Eugene <br /> 99 E. Broadway, #400- <br /> Eugene, OR 97401 <br /> (541)682-5291. <br /> :DATE CONTRACT NO. <br /> 9/29/2009 2010-502 <br /> PROJECT NAME JOB NO. <br /> <br /> - Franklin Corridor EmX Intersection Upgrade 4650 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Brown Contracting Inc. <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Keith Jurasevich 541-682-5247- <br /> FIRST NOTIFICATION <br /> 8!24/2009 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT.-00180.50) DAYS CHARGED DATE (S) THE'WORK WAS SUBSTANTIALLY , <br /> BEYOND SPECIFIED COMPLETED& THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 9/11/2009 WA :9/8/2009.. <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BYc 10/12/2009 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVI810NS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period.. <br /> 9/29/2009 IS THE DATE~ON WHICH ALL CONTRACT WORK WAS COMPLETED,' INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL,-SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS; BILLS AND OTHER DOCUMENTS; <br /> REQUIRED UNDER THE CONTRACT.'THIRD NOTIFICATION INITIATES THE STARTOF THE ONE YEAR WARRANTY PERIOD: <br /> IN ACCORDANCE WITH SECTION 001.70 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALLWORK•I$ GUARANTEED BY THE <br /> CONTRACTOR. FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE QFINORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN IN EFFECT FOR THEbURATiON OF THE EXPRESSED LENGTH OF.THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR Is RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS tN WORK THAT BECOME EVIDENT' <br /> WITHIN THE ONE <br /> YEAR WARRANTY PERIOD. REPAIRS DR REP.LACEMENTS'MADE 1NITHIN THE ONE YEAR WARRANTY PERIOD WILLS <br /> REQUIRED TO BE GUARANTEED FOR ONE: YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. ~ c <br /> Inspector. ignature <br /> For Privately Engineered- Projects Only <br /> Engineer: ' PB <br /> Address: 400 SW 6~"Ave., Suite 800 <br /> Portland; Oregon 97204 <br /> Owner: Lane Transit District <br /> Address: PO Box 7070. <br /> Eugene, Oregon 97401 <br /> DISTRIBUTION FOR FIRST; SECOND, AND THIRD NOTIFICATION; <br /> Contractor Engineer. Owner Construction Manager File GingerPerales; PWM <br /> ..ADDITIONAL DISTRIBUI`ION -FOR THIRD NOTIFICATION: <br /> POS Maintenance-Planning Surety. PW Administration PIC Engineering PWE As Construct Monitor MADD:Supenrisoclnspector <br /> O:\PROJECTS\PROJ-O\4650 Franklin Ave. Intcrseetions\Correspondence\Contractors\4650-20090929 kmj Third Notification.doc March Zoos <br /> M6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.