New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4608 Eugene Sand 2010-00007
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4608 Eugene Sand 2010-00007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:09:49 PM
Creation date
10/14/2009 11:51:57 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004608
GL_Project_Number
995502
COE_Contract_Number
2010-00007
Retention_Destruction_Date
6/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STANDARD.SPECIFICATIONS <br /> The 2008 Oregon Standard Specifications for Construction Volumes I and II (Oregon Specifications) as . <br /> issued in 2008, and the City of Eugene Standard Drawings, in effect as of January 27, 2009, both as revised <br /> by Amendment #1 have been adopted as the Standard Specifications and Standard Drawings for the City of , <br /> Eugene in accordance with City Code section 7.085. Amendment•#1 is hereby made a part of the Standard <br /> Specifications and Standard Drawings of the City of Eugene as fully and completely as if it were set forth <br /> therein. The Standard Specifications, Standard Drawings and all Addenda may be examined at the <br /> Engineering. office located at 99 E. Broadway, Suite 400, Eugene OR 97401.. <br /> SUPPLEMENTAL SPECIFICATIONS <br /> The section, subsection. and drawing numbers of the Supplemental Specifications correlate to the section <br /> <br /> . and subsection numbers of the 2008 Oregon Standard Specifications and Standard Drawings. <br /> 00165.10(a) Materials Acceptance Guides -Field Tested Materials <br /> (DELETE) At the end of the first sentence, "at the discretion and frequency determined by the <br /> Engineer" <br /> .(ADD) "pursuant to the Eugene Field tested Materials Assurance Guide (Eugene FTMAG). <br /> Additional testing may be conducted as determined by the Engineer.". <br /> 00165.10 Materials Acceptance Guide's -Changes to the MFTP ~ . <br /> Section 2: Quality Assurance Program <br /> (DELETE) At the beginning of the second sentence of the first paragraph, delete the words"At the <br /> Engineer's discretion," <br /> (DELETE) At the end of the last sentence of the first paragraph, delete the words "at the discretion <br /> of the Engineer and at times and locations determined by the Engineer." <br /> (ADD) At the end of the last sentence of the first paragraph, insert "pursuant to the Eugene <br /> FTMAG. Additional testing may be conducted as determined by the Engineer." . <br /> (DELETE}. Section 4(D): Field Tested Materials Guide. The entire.paragraph in the.Amendment. <br /> (ADD) Section 5: Field Tested Materials Guide•(Type D & E Projects} <br /> Contractor shall comply with the requirements of Section 5 Quality Control for Type D <br /> Projects. <br /> Section 5: Field Tested Materials .Guide (Type D & E Projects) <br /> (DELETE) Delete the matrix columns that reference "Quality Assurance. by the Project Manager". <br /> (ADD) Verification and assurance testing is pursuant to the Eugene FTMAG. <br /> 00165.30(c) ..Field Tested Materials -Acceptance of field Tested Materials • <br /> (DELETE) In the second sentence, delete the words "at the frequency and discretion. of the <br /> Engineer" <br /> (ADD). "pursuant to the Eugene FTMAG. Additional testing may be~conducted as determined by <br /> .the Engineer." <br /> Standard Specifications Page 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.