New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4608 Eugene Sand 2010-00007
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4608 Eugene Sand 2010-00007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:09:49 PM
Creation date
10/14/2009 11:51:57 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004608
GL_Project_Number
995502
COE_Contract_Number
2010-00007
Retention_Destruction_Date
6/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> j ~ <br /> part and/or the withholding of any funds due or to become due to Contractor, <br /> • pending compliance by Contractor andlor its subcontractors, with the terms of . <br /> paragraphs 7.2.1 and 7.2.2. <br /> 8. Indemnification. To the•fullest extent permitted by law, Contractor shall indemnify, defend <br /> (with counsel approved by City) and hold harmless City, its officers, agents and employees, <br /> the Architect/Engineer, Architect/Engineer's consultants, and their respective officers, <br /> directors, agents, employees, partners, members, stockholders and affiliated companies from <br /> • and against all liabilities, damages, losses, claims, expenses (including reasonable attorney - <br /> fees.), demands and actions of any nature whatsoever, arising out of or resulting from <br /> Contractor's performance or failure to perform under the Contract, as further specified in the <br /> General Conditions. <br /> 9. Insurance. Contractor shall maintain in force for the duration of the Contract the insurance <br /> coverages specified within the General Conditions. Each policy required by these provisions <br /> shall be written as a primary policy, not contributing with or in excess of any coverage which <br /> City may carry. A copy of each policy or a certificate satisfactory to City shall be delivered to <br /> City prior to commencement of the Work. Unless otherwise specified, each policy shall be <br /> .written on an "occurrence" form with an admitted insurance carrier licensed to do business in <br /> he state of Oregon and shall contain an endorsement'entitling.Clty to not less than 30.days <br /> - prior written notice of any material change, nonrenewal or cancellation. In the event the <br /> statutory limit of liability of a public body for claims arising out of a single accident or <br /> occurrence is increased above the combined single limit coverage requirements specified . <br /> below, City shall have the right to require Contractor to increase Contractor's coverages by <br /> the amount. of the statutory limit increase for such claims and to increase the aggregate <br /> coverage by an amount that is twice as large as the statutory increase. 'The adequacy of all <br /> insurance required under the Contract shall be subject to approval by City's Risk Manager. <br /> Failure to maintain any insurance coverage required by the Contract shall be cause for <br /> :immediate termination of the Contract by City. <br /> 10. Performance and .Payment Bonds. Prior to the commencement of the Work, Contractor <br /> hall provide good and sufficient performance and payment bonds approved by City and <br /> substantially in the form of the bonds included. in.the Solicitation Documents. <br /> 11. Termination and Suspension. City may terminate the Contractor suspend the Work at any <br /> time as provided in the Specifications. . <br /> 12. Preference for Goods and Services. <br /> 12.1. Contractor shall use recyclable products to the maximum extent economically feasible <br /> in the performance of the Work. Recycled products include a!I materials, goods and <br /> supplies, not less than 50% of the total weight of which consists of secondary and post <br /> consumer waste with not less than 10% of its total weight consisting of post consumer <br /> waste, as well as any product that.could have been disposed of as a solid waste, <br /> having completed its life cycle as a consumer item, but otherwise refurbished for reuse <br /> without substantial alteration of the product's form. <br /> 12.2. In performance of the Work, Contractor shall prefer materials that have been <br /> manufactured or produced in the state of Oregon, if price, fitness, availability and quality <br /> are otherwise equal. <br /> 13. Nonresident Contractors. <br /> 13.1..If Contractor is a nonresident contractor and the Contract Amount exceeds $10,000, <br /> Contractor shall promptly report to the Department of Revenue on forms to be provided <br /> by the Department of Revenue the total Contract Amount; terms of payment, length of <br /> Public Improvement Contract for Use v?ith Oregon Standard. Specifications -Page 3 <br /> (Revised October 2008} <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.