Final Acceptance Pubficworks <br /> <br /> Completion of Warranty Period Engineering <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> {541):682-8410 <br /> To: H & J Construction Date: October 7, 2009 <br /> Attn: Phil Heer <br /> PO Box 2432 From: Michael E. Wikon <br /> Eugene, Oregon 97402 <br /> Project: Concrete Paving, Wastewater & Stormwater Systems on 6th Alley from Tyler St to Polk St <br /> Contract Number: 2008-28 Job Number: 4527. <br /> A warranty. inspection has been made on this project in accordance with .Section 00150 of the <br /> City Standard Specifications.and Standard Drawings <br /> No defects were noted and/or were corrected the project is hereby. accepted by the City for <br /> permanent maintenance. . <br /> FOR PRIVATELY ENGINEEREDPROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner. <br /> Address:- - <br /> Q:\PROJECTS\PROJ-714527 6ttt Alley -Tyler and Polk\Correspondence\Contractors\4527-2009100 ' a . ptance Completion of VVerranty Period.doc <br /> ENG-1122 Contractor File. Engineer Owner Surety P1N Admin Construction Manager Revised 4/04 <br /> .Finance/Accts Receivable for assessable projects or City Recor or nonassessable projects <br /> <br />