New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4546 Babb Const Pmt#3
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4546 Babb Const Pmt#3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2012 4:04:08 PM
Creation date
10/8/2009 2:13:31 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004546
GL_Project_Number
985374
Identification_Number
2010100033
COE_Contract_Number
2009-00030
Retention_Destruction_Date
6/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Run Date: 10/07/2009 16:55:31 Page 6 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 003 <br />Contractor: BABB CONSTRUCTION Original Contract: $2,120,407.20 <br />Job #: 93- 004546 Current Amount: $2,134,193.09 <br />Contract No: 2009 -00030 Contract Award Date: 07/02/2009 <br />PO #: 2010100033 Completion Date: 10/20/2010 <br />Assessable: No <br />Current Contract Estimated Payment Cumulative Totals g Complete <br />Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br />0810 <br />REMOVE 12" PIPE <br />$40.00 <br />FOOT <br />55.000 <br />$2,200.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0820 <br />4" STORMWATER PERF PIPE (WRAPP <br />$2.00 <br />FOOT <br />1,307.000 <br />$2,614.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0830 <br />10 INCH PVC STORM PIPE <br />$27.00 <br />FOOT <br />741.000 <br />$20,007.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0840 <br />12 INCH PVC STORM PIPE <br />$33.50 <br />FOOT <br />5,900.000 <br />$197,650.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0850 <br />15 INCH PVC STORM PIPE <br />$36.00 <br />FOOT <br />345.000 <br />$12,420.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0860 <br />15 INCH REINFORCED CONCRETE PI <br />$48.00 <br />FOOT <br />24.000 <br />$1,152.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0:00 <br />0.00 <br />0870 <br />VIDEO INSPECTION <br />$1.00 <br />FOOT <br />7,010.000 <br />$7,010.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0880 <br />CONCRETE STORM DRAIN MANHOLES <br />$2,200.00 <br />EACH <br />49.000 <br />$107,800.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0890 <br />CONCRETE INLETS, TYPE 4A <br />$1,282.80 <br />EACH <br />5.000 <br />$6,414.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0900 <br />DITCH INLETS, TYPE D <br />$876.70 <br />EACH <br />33.000 <br />$28,931.10 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0910 <br />SLOPED OUTFALL PROTECTION <br />$400.00 <br />EACH <br />2.000 <br />$800.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0920 <br />MINOR ADJUSTMENT OF MANHOLES <br />$450.00 <br />EACH <br />34.000 <br />$15,300.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0930 <br />ADJUSTMENT OF WATER VALVES <br />$150.00 <br />EACH <br />18.000 <br />$2,700.00- <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0940 <br />1 -1/2" - 0 AGGREGATE BASE <br />$15.55 <br />TON <br />7,744.000 <br />$120,419.20 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0950 <br />3/4" - 0 AGGREGATE BASE <br />$26.60 <br />TON <br />612.000 <br />$16,279.20 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0960 <br />8" THICK CEMENT TREATED BASE <br />$11.45 <br />SQYD <br />11,485.000 <br />$131,503.25 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0970 <br />LEVEL 2 , 1/2" DENSE HMAC <br />$54.00 <br />TON <br />198.000 <br />$10,692.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0980 <br />LEVEL 3, 1/2" DENSE HMAC <br />$53.00 <br />TON <br />4,835.000 <br />$256,255.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 M <br />0.00 <br />0990 <br />EXTRA FOR ASPHALT APPROACHES <br />$1.15 <br />SQFT <br />17,019.000 <br />$19,571.85 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />1000 <br />CONCRETE CURBS (E =0 11 ) <br />$5.50 <br />FOOT <br />11,066..000 <br />$60,863.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />1010 <br />CONCRETE CURBS (E =6 ") <br />$8.07 <br />FOOT <br />4,438.000 <br />$35,814.66 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />1020 <br />VALLEY GUTTERS <br />$30.96 <br />FOOT <br />54.000 <br />$1,671.84 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />1030 <br />CONCRETE DRIVEWAYS <br />$3.52 <br />SQFT <br />3,947.000 <br />$13,893.44 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />1040 <br />CONCRETE WALKS, 4" THICK <br />$3.12 <br />SQFT <br />26,808.000 <br />$83,640.96 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.