Run Date: 10/07/2009 16:41:56 Page 4 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 004 <br /> Contractor: BAHB CONSTRUCTION g $916,940.18 <br /> Ori final Contract: <br /> Job 93-003923 Current Amount: $918,291.12 <br /> Contract No: 2009-00027 Contract Award Date: 06/15/2009 <br /> PO 2009100421 Completion Date: 10/30/2009 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0450 CONCRETE WALKS $2.39 SQFT 21,934.000 $52,422.26 0.000 $0.00 0.000 $0.00 0.00 <br /> 0460 CONCRETE WALKS, 5" THICK $2.53 SQFT 733.000 $1,854.49 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0470 CONCRETE WALKS, 7" THICK $3.34 SQFT 657.000 $2,194.38 0.000 $0.00 0.000 $0.00 0.00 <br /> 0480 CONCRETE WALKS, 9" THICK $5.08 SQFT 279.000 $1,417.32 0.000 $0.00 0.000 $0.00 0.00 <br /> 0490 ADA TEXTURING $18.00 SQFT 120.000 $2,160.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0500 PVMT LEGEND, TYPE A-2: ARROWS $160.00 EACH 6.000 $960.00 0.000 $0.00 0.000 $0.00. ,0.00 <br /> 0510 PVMT LEGEND, TYPE A-2: "ONLY" $220.00 EACH 1.000 $220.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0520 PVMT LEGEND, TYPE A-2: BICYCLE $155.00 EACH 8.000 $1,240.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0530 PVMT LINE,. TYPE A-2 $8.00 SQFT 424.000 $3,392.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0540 BI-DIRECTIONAL YELLOW TYPE I M $5.10. EACH 50.000 $255.00 0.000 $0.00 0.000 $0.00 O.DO <br /> 0550 THERMOPLASTIC, NON-PROFILE, 90 $13,820.00 LUMPSUM 1.000 $13,820.00 0.000 $0.00 0.000 $0.00 O.DO <br /> 0560 REMOVE AND REINSTALL EXISTING $500.00 LUMPSUM 1.000 $500.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0570 TYPE R SIGNS IN PLACE $100.00 .EACH 2.000 $200.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0580 TYPE W1 SIGNS IN PLACE $150.00 EACH 8.000 $1,200.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0590 TYPE W2 SIGNS IN PLACE $150.00 EACH 8.000 $1,200.00 0.000 $0.00 O.OOD $0.00 0.00 <br /> 0600 TYPE Y1 SIGNS IN PLACE $150.00 EACH 4.000 $600.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0610 STREET END BARRICADE, TYPE A $400.00 LUMPSUM 1.000 $400.00 0.000 $O.DO 0.000 $0.00 O.DO <br /> 0620 STREET LIGHTS, COMPLETE $61,178.00 LUMPSUM 1.000 $61,178.00 0.050 $3,058.90 0.550 .$33,647.90 55.00 <br /> 0630 TRAFFIC SIGNAL INSTALLATION $137,270.00 LUMPSUM 1.000 $137,270.00 0.000 $0.00 0.220 ,$30,199.40 M 22.00 <br /> 0640 IRRIGATION SYSTEM $7,000.00 LUMPSUM 1.000 $7,000.00 0.000 $0.00 0.050 - $350.00 5.00 <br /> 0650 TOPSOIL, IMPORTED $14.60 TON 960.000 $14,016.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0660 RE-USE OF NATIVE TOPSOILS $8.00 CUYD 400.000 $3,200.00 0.000 $0.00 38.100 $304.80 10.00 <br /> 0670 PLANTING AREA PREPARATION $0.07 SQFT 8,088.000 $566.16 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0680 MEDIAN DECIDUOUS TREES (1.5" C $175.00 EACH 9.000 $1,575.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />