Run Date: 10/08/2009 10:42:47 Page 4
<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> Payment No 002
<br /> Qontractor: WILDISH CONSTRUCTION Original Contract: $878,656.55
<br /> Job 93-004528 Current Amount: $878,656.55
<br /> Contract No: 2009-00026 Contract Award Date: 06/15/2009
<br /> PO 2009100420 Completion Date: 10/02/2009
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals % Complete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> 0420 REPLACE CURB INLET TOP $1,000.00 EACH 1.000 $1,000.00 0 000
<br /> $0 00 0 000 $0 00 0 00
<br /> 0430 ASPHALT CONCRETE PAVfiMENT REPA $85.00 CUYD 210.000 $17,850.00 114.110 $9,699.35 114.110 $9,699.35 54.00
<br /> 0440 COLD PLANE PVMT REMOVAL, TAPER $0.42 SQFT 3,840.000
<br /> $1,61z.8o o.ooo $o.oo o.ooo $o.oo o.oo
<br /> 0450 COLD PLANE PVMT REMOVAL, 1" DE $0.06 SQFT 35,700.000 $2,202.00 37 196 700 $2,231 80 37,196 700 $2,231 80 101 00
<br /> 0460 COLD PLANE PVMT REMOVAL, 3" DE $0.15 SQFT 51,730.000 $7,759.50 52,305.900 $7,845.89 57,525.400 $8,628.81 111.00
<br /> 0470 COLD PLANE PVMT REMOVAL, TAPER $0.15 SQFT 47,210.000 $7,081.50 46,891.900 $7,033.79 50,999.700 $7,649.96 108.00
<br /> 0480 COLD PLANE PVMT REMOVAL, 6" DE $0.38 SQFT 12,700.000 $4,826.00 12 901 000 $4,902 38 12,901 000 $4,902 38 102.00
<br /> 0490 LEVEL 3, 1/2" DENSE WMAC $49.00 TON 3,200.000. $156,800.00 2,587.260 $126,775.74 2,899.140 $142,057.86 M 91.00
<br /> 0500 THIN WHITETOPPING $3.80 SQFT 12,330.000 $46,854.00 12,334.000 $46,869.20 12,334.000 $46,869.20 100.00
<br /> 0510 SAW CUTTING FOR THIN WHITETOPP $2.00 FT 4,350.000 $8,700.00 4,224.000 $8,448.00 4,224.000 $8,448.00 97.00
<br /> 0520 CONCRETE WIDE CURB AND GUTTER $65.00 FT 65.000 $4,225.00 100.500 $6,532.50 100.500- $6,532.50 155.00
<br /> 0530 PVMT LEGEND, TYPE A2: ARROWS $160.00 EACH 10.000 $1,600.00 10.000 $1,600.00 10.000 $1,600.00 100.00
<br /> 0540 PVMT LEGEND, TYPE A2: BICYCLfi $165.00 EACH 6.000 $990.00 6 000 $990 00 6 000 $990 00 100 00
<br /> 0550 PVMT LEGEND, TYPE A2: RR CROSS $900.00 EACH 6.000 $5,900.00 6.000 $5,400.00 6.000 $5,400.00 100.00
<br /> 0560 PVMT LEGEND, TYPE A2: BIKE RR $550.00 EACH 6.000 $3,300.00 6.000 $3,300.00 6.000 $3,300.00 100.00
<br /> 0570 PVMT LEGEND, TYPE A2: "STOP" $200.00 EACH 4.000
<br /> $800.00 4.000 $800 00 4 000 $800 00 100 OD
<br /> 0580 PVMT LINE, TYPE A2 OR B $6.00 SQFT 725,000 $4,350.00 727.800 $4,366.80 727.800 $4,366.80 100.00
<br /> 0590 MONO-DIRECTIONAL CRYSTAL TYPE $4.00 EACH 725.000 $2,900.00 38.000 $152.00 38.000 $152.00 5.00
<br /> 0600 BI-DIRECTIONAL YELLOW TYPE I M $4.00 EACH 225.000 $900.00 213.000 $852.00 213.000 ~ $852.00 95 00
<br /> 0610 THERMOPLASTIC, NON-PROFILE, 90 $19,700.00 LUMPSUM 1.000 $19,700.00 1.000 $19,700.00 1.000 $19,700.00 100.00
<br /> 0620 LOOP DETECTORS INSTALLATION $453.00 EACH 18.000 $8,154.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0630 JUNCTION BOX, TYPE 1 $356.00 EACH 3.000 $1,068.00 0.000 $0.00 3.000 $1,068.00 100 00
<br /> 0640 CONDUIT UNDER LANDSCAPED AREAS $15.45 FT 115.000 $1,776.75 0.000 $0.00 110.SD0 $1,707.23 96.00
<br />
<br /> 0650 CONDUIT UNDER NARD SURFACING $52.50 FT 70.000 $3,675.00 0.000 $0.00 98.000 $5,145.00 140.00
<br />
<br />
|