Final Acceptance Pubrcworks <br /> ,Completion of Warranty Period Engineering <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> - - (541) 682-8410 <br /> To: 2G Construction Date: September 21, 2009 <br /> PO BOX 11735 <br /> Eugene, OR 97440 From: Charley Perini <br /> Project: 2008 Community WVV Extensions - <br /> Contract Number:. 2008-33 ~ Job'Number: 4506 ` <br /> A warranty inspection has been made on this project in accordance with Section: 00150 of the <br /> City Standard Specifications and Standard ,Drawings. <br /> No defects were.: noted and/or were corrected the project. is hereby acxepted by the City fo"r <br /> permanent maintenance.. <br /> FOR-PRIVATELY ENGINEERED. PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner. <br /> Address: <br /> :\PROJECTS\PROJ-6\4506 2008 Communit Wastewater Extensions\Corres ondence\Contractors\4506-20090921 CTP Final Acce tance Com letion <br /> <br /> of Warranty Period.doc <br /> ENG 1122 Contractor File Engineer Owner Surety RW Admin Construction Manager Revised 4/04 <br /> Finance/Accts Receivable for assessable projects or City Recor or nonassessable projects <br /> <br />