_ _ _ <br /> Run Date: 09/03/2009 15:37:14 <br /> Page 4 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Contractor: KNIFE RIVER Original Contract: $543,004.30 2 <br /> Job 93-004610 Current Amount: $662,724.30 p ~ <br /> Contract No: 2010 00001 <br /> Contract Award Da 3~ <br /> te• 07/14/2009 <br /> PO 2 <br /> 010100049 Completion Date: 09/04/2009 ~ 3 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals g Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0410 TEMP. WORK ZONE TRAFFIC CONTRO $9,400.00 LUMPSUM 1.000 $9,400.00 1.000 $9,400.00 1.000 $9,400.00 100.00 <br /> 0420 EROSION CONTROL $2,000.00 LUMPSUM 1.000 $2,000.00 0.700 $1,400.00 1.000 $2,000.00 100.00 <br /> 0430 TEMPORARY STRIPING $1,800.00 LUMPSUM 1.000 $1,800.00 1.000 $1,800.00 1.000 $1,800.00 100.00 <br /> 0440 FLAGGERS $42.00 HOUR 500.000 <br /> $21,000.00 594.500 $24,969.00 594.500 3~ ~~.J~ $24,969.00 119.00 <br /> 0450 CITY PROVIDED SPEC INFO SIGNS $250.00 .EACH 2.000 $500.00 0.000 $0.00 2.000 $500.00 100.00 <br /> 0460 PORTABLE CHANGEABLE MESSAGE SI $1,900.00 EACH 2.000 $3,800..00 1.000 $1,900.00 2.000 $3,800.00 100.00 <br /> 0470 ADJUSTING BOXES $250.00 EACH 2.000 $500.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0480 MINOR ADJUSTMENT OF MANHOLES $940.00 EACH 8.000 $7,520.00 11.000 $10,340.00 11.000'1,~~'O/ $10,340.00 136.00 <br /> 0490 REM/REPL FRAME/COVER - ST $300.00 EACH 5.000 $1,500.00 10.000 $3,000.00 10.000 (~D $3,000.00 200.00 <br /> 0500 "COLD PLANE PVMT REMOVAL, 2" DE $0.20 SQFT 42,408.000 .$8,481.60 0.000 $0.00 0.000 $0.00 0,00 <br /> 0510 COLD PLANE PVMT REMOVAL, 3" DE $0.25 SQFT 64,113.000 $16,028.25 78,386.600 $19,596.65 78,386.600 35~~~ $19,596.65 122.00 <br /> 0520 LEVEL 3, 1/2", DENSE, HMAC 001 $50.00 TON 2,680.000 $134,000.00 3,060.670 $153,033.50 3,060.670 1~tC3~ $153,033.50 M~- 114.00 <br /> 0521 EXTRA WARM MIX ASPHALT CONC(JO 002 <br /> $2.50 TON 2,680.000. $6,700.00 3,060.670` $7,651.68 3,060.670 ~5\.''~'' $7,65L 68 114.00 <br /> $68.00 CUYD 152.000 <br /> 0530 ASPHALT CONCRETE PAVEMENT REPA $10,336.00 189.000 $12,852.00 189.000 aS~,la~o <br /> $12,852.00 124.00 <br /> 0540 THERMOPLASTIC, NON-PROFILE, 90 $22,600.00 LUMPSUM 1.000 $22,600.00 0.766 $17,311.60 0.766 $17,311.60 77.00 <br /> 0550 PVMT LINE, TYPE A2 OR B $8.00 SQFT 247.000 $1,976.00 275.000 $2,200.00 275.000 2a`~ $2,200.00 111.00 <br /> 0560 PVMT LEGEND, TYPE A2: ARROWS $270.00 EACH 2.000., $540.00 2.000 $540.00 2.000 $540.00 100.00 <br /> 0570 PVMT LEGEND, TYPE A2: BICYCLE $270.00 EACH 8.000', $2,160.00 8.000 $2,160.00 8.000 $2,160.00 100.00 <br /> 0580 MONO-DIRECTIONAL CRYSTAL TYPE $10.00 EACH 10.000 $100.00 5.000 $50.00 5.000 $50.00 50.00 <br /> 0590 BI-DIRECTIONAL YELLOW TYPE I M $10.00 EACH 95.000 $950.00 91.000 $910.00 91,000 $910.00 96.00 <br /> 0600 LOOP DETECTORS INSTALLATION $500.00 EACH 12.000 $6,000.00 12.000 $6,000.00 12.000 $6,000.00 100.00 <br /> <br /> 0610 PAVEMENT REMOVAL, 5" (JOB #461 001" $0.78 SQFT 31,000.000 $24,180.00 34,893..800 $27;217.16 34,893.800 ~iU3~i,lb $27,217.16 ' 113.00 <br /> 0620 CURB & GUTTER REPLACEMENT (JOB 001 $20.00 LINFT 35.000 pD <br /> $700.00 36.000 $720.00 36.000 ab,~ $720.00 ' 103.00 <br /> 0630 OVER-EXCAVATION (JOB #4610) 001 $54.85 CUYD 700.000 ~ $38,395.00 713.500 $39",135.48 713.800 -~4D.'~~ $39,135.48 - 102.00 <br /> `t h <br /> C~,~' y~~b J ,~(~3~ 7JS ~3~~~, $329,666.85 $350,687.07 $353,687.07 <br /> <br />