Run Date: 09/08/2009 11:48:48 <br /> <br /> ~ ~ City of Eugene Page 4 <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: WILDISH CONST. Ori final Contract: <br /> Job 93-004529 g $789,585.00 <br /> Contract No: 2009-00025 Current Amount: $805,085.00 <br /> PO 2009100411 Contract Award Date: 06/15/2009 <br /> Completion Date: 10/09/2009 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals & Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0410 FILLING ABANDONED PIPES $25.00 FOOT 24.000 $600.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0420. REMOVE WW HANGER PIPE AND MOUN $13.00 FOOT 414.000 $5,382.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0430 REMOVE WW COLLECTION BOX $2,400.00 LUMPSUM 1.000 $2,400.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0440 12 INCH PVC WW PIPE $200.00 FOOT 411.000 $82,200.00 .0.000 <br /> $o.oo o.ooa $o.oo M o.oo <br /> 0450 ASPHALT CONCRETE PAVEMENT REPA $80.00 CUYD 110.000 $8,800.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0460 PAVEMENT REMOVAL $4.00 SQFT 430.000 $1,720.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0470 CONCRETE GRINDING $10.00 SQFT 60.000 $600.00 41.200 <br /> $412.00 41.200 $412.00 69.00 <br /> 0480 COLD PLANE PVMT REMOVAL, 2" DE $0.10 SQFT 225,000.000 $22,500.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0490 COLD FLANE PVMT REMOVAL, 4" DE $0.10 SQFT 36,500.000 $3,650.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> OSDO LEVEL 3, 1/2" DENSE HMAC $51.00 TON 4,250.000 $216,750.00 0.000 <br /> $D,oO o.ooo $o.oo M o.oo <br /> 0501 EXTRA WARM MIX ASPHALT(JOB 452 001 $2.50 TON 4,250.000 $10,625.00 0.000 <br /> $0.'00 0.000 $O.DO 0.00 <br /> 0510 CONCRETE CURBS $23.00 FOOT 43.000 $989.00 140.400 $3,229.20 140.400 $3,229.20 327.00 <br /> 0520 CONCRETE CURB AND GUTTER $34.00 FOOT 135.000 $4,590.00 53.300 <br /> $1,812.20 53.300 $1,812.20 39.00 <br /> 0530 STANDARD CONCRETE GUTTER $30.00 FOOT 6.000 $180.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0540 CONCRETE WALKS $7.00 SQFT 1,620.000 $11,340.00 1,246.700 <br /> $8,740.90 1,248,700 $8,740.90 77.00 <br /> 0550 CONCRETE DRIVEWAYS, 7 INCH THI $13.00 SQFT 100.000 $1,300.00 177.364 $2,305.73 177.364 $2,305.73 177.00 <br /> 0560 TRUNCATED DOME TEXTURING $25.00 SQFT 84.000 $2,100.00 64.000 $1,600.00 64.000 $1;600.00 76.00 <br /> 0570 PVMT LEGEND, TYPE A: ARROWS $125.00 EACH 35.000 $4,375.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0580 PVMT LEGEND, TYPE A: BICYCLE L $200.00 EACH 2.000 $400.00 O.ODO <br /> $0.00 0.000 $O.DO 0.00 <br /> 0590 PVMT LINE, TYPE A OR B $4.50. SQFT 4,112.000 $18,504.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0600 THERMOPLASTIC, NON-PROFILE, 90 $12,000.00 LUMPSUM 1.000 $12,000.00 0.000 <br /> $D.DO O.ODO $0.00 0.00 <br /> 0610 MONO-DIRECTIONAL .CRYSTAL TYPE $5.00 EACH 434.000 $2,170.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0620 CONDUIT UNDER HARD SURFACING $6D .00 FOOT 30.000 $1,800.00 18.000 <br /> $1,oeo.oD 18.000 $1,Deo.oo 60.ao <br /> 0630 JUNCTION BOX, TYPE 2 $550.00 EACH. 2.000 $1,100.00 2.000 $1,100.00 2.000 $1,100.00 100.00 <br /> <br />