<br /> Run Date: 09/08/2009 11:13:38 <br /> City of Eugene Page 2 <br /> ' Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: WILDISH CONSTRUCTION g $878,656.55 <br /> Job 93-004501 Ori final Contract: <br /> Current Amount: $878,656.55 <br /> Contract No: 2009-00026 Contract Award Date: 06/15/2009 <br /> PO 2009100420 Com letion Da <br /> p to 10/02/2009 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> PPP HS~LESEN RD FROM W 11TH TO W 18TH AVE <br /> General <br /> 0000 Liquidated Damages-Bertelsen ( ($400.00) DAY 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $10,000.00 LUMPSUM 1.000 $10,000.00 1.000 <br /> $10,ooo.oa l.ooo $lo,ooo.oa loo.oD <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $7,000.00 LUMPSUM 1.000 $7,000.00 0.500 <br /> $3,500.00 0.500 $3,500.00 50.00 <br /> 0030 TEMPORARY STRIPING $4,000.00 LUMPSUM 1.000 $4,000.00 0.900 <br /> $3,600.00 0.900 $3,600.00 90.00 <br /> 0040 PORTABLE CHANGEABLE MESSAGE SI $3,000.00 EACH 2.000 <br /> $6,000.00 1.000 $3,000.00 1.000 $3,000.00 50.00 <br /> 0050 FLAGGERS $39.00 HOUR 600.000 $23,400.00 160.000 <br /> $6,240.00 160.000 $6,240.00 27.00 <br /> 0060 CITY PROVIDED SPEC INFO SIGNS $200.00 EACH 4.000 $800.00 2.000 <br /> $400.00 2.000 $400.00 50.00 <br /> 0070 EROSION CONTROL $700.00 LUMPSUM 1.000 $700.00 0.700 <br /> $490.00 0.700 $490.00 70.00 <br /> 0080 ADJUSTING BOXES $250.00 EACH 26.000 $6,500.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0090 MINOR ADJUSTMENT OF MANHOLES $900.00 EACH 22.000 $19,800.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0100 MH REM/REPL FRAME/COVER-WW $259.00 EACH 14.000 $3,626.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0110 NIIi REM/REPL FRAMB/COVER-ST $259.00 EACH 8.000 $2,072.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0120 CONCRETE STORM DRAIN MANHOLES, $6,000.00 EACH 3.000 $18,000.00 3.000 <br /> $18,000.00 3.000 $18,000.00 100.00 <br /> 0130 COLD PLANE PVMT REMOVAL, 2" DE $0.10 SQFT 40,000.000 <br /> $4,000.00 35,124.700 $3,512.47 35,124.700 $3,512.47 88.00 <br /> 0140 COLD PLANE PVMT REMOVAL, 4" DE $0.15 SQFT 83,000.000 $12,450.00 102,160.300 $15,324.05 102,160.300 $15,324.05 123. <br /> 0150 LEVEL 3, 1/2" DENSE WMAC $45.00 TON 2,600.000 <br /> $117,000.00 1,245.980 $56,069.10 1,245.980 $56,069.10 M 98.00 <br /> 0160 PVMT LEGEND, TYPE A2: ARROWS $150.00 EACH 4.000 <br /> $600.00 0.000 $o.oD o.ooo $o,ao o.oo <br /> 0170 PVMT LEGEND, TYPE A2: BICYCLE $160.00 EACH 4.000 <br /> $640.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0180 PVMT LINE, TYPE A2 OR B $7.00 SQFT 206.000 $1,442.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0190 MONO-DIRECTIONAL CRYSTAL TYPE $5.00 EACH 17.000 $85.00 0.000 <br /> $O.AO 0.000 $0.00 0.00 <br /> 0200 BI-DIRECTIONAL YELLOW TYPE I M $5.00 EACH 180.000 $900.00 O.OOD <br /> $0.00 0.000 $0.00 0.00 <br /> 0210 THERMOPLASTIC, NON-PROFILE, 90 $15,900.00 LUMPSUM 1.000 $15,900.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> <br />