Run Date: 09/03/2009 14:56:47 <br /> <br /> i <br /> City of Eugene Page 2 <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: Delta Construction Co. Original Contract: 186 196.00 <br /> _ $ , <br /> Job 93 004524 <br /> Current Amount: $187,806.00 <br /> Contract No: 2010-00002 <br /> Contract Award Date: 07/14/2009 <br /> PO 2010100047 Completion Date: 03/01/2011 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantit Amount <br /> Y Quantity Amount <br /> FOX HOLLOW RD STORMWATER CAPACITY UPGRADE <br /> General <br /> 0000 Liquidated Damages ($500.00) DAY 0.000. $0.00 0.000 $0.00 0.000 $0.00 O.DO <br /> 0010 MOBILIZATION $8,298.00 LUMPSUM 1.000 $8,298.00 1.000 $8,298.00 1.000 $8,298.00 100.00 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $1,700.00 LUMPSUM 1.000 $1,700.00 0.500 $850.00 0.500 $850.00 50.00 <br /> 0030 EROSION CONTROL $2,500.00 LUMPSUM 1.000 $2,500.00 0.300 $750.00 0.300 $750.00 30.00 <br /> 0040 DEWATERING $8,400.00 LUMPSUM 1.000 $8,400.00 0.300 $2,520.00 0.300 $2,520,00 .30.00 <br /> 0050 TREE PROTECTION $600.00 LUMPSUM 1.000 $600.00 0.500 $300.00 0.500 $300.00 50.00 <br /> 0060 CLEARING AND GRUBBING $7,096.00 LUMPSUM 1.000 $7,096.00 0.500 $3,548.00 0.500. $3,548.00 50.00 <br /> 0070 TREE REMOVAL $800.00 EACH 5.000 $4,000.00 4.000 $3,200.00 4.000 $3,200.00 80.00 <br /> 0080 GENERAL EXCAVATION $8.00 CUYD 3,700.000 $29,600.00 2,200.000 $17,600.00 2,200.000 $17,600.00 M 59.00 <br /> 0090 FINISH GRADING $7,000.00 FRCACCT 1.000 $7,000.00 0.080 $560.00 0.080 $560.00 8.00 <br /> 0091 3"-0" CRUSHED AGGREGATE 001 $13.10 TON 50.000 $655.00 29.020 $380.16 29.020 $380.16 58.00 <br /> 0092 1 1/2"-0" CRUSHED AGGREGATE 001 $12.60 TON 70.000 $882.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0093 3/4"-0" CRUSHED AGGREGATE 001 $12.80 TON 30.000 $384.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0100 LOOSE RIP RAP, CLASS 200 $44.00 TON BL OOD $3,564.00 0.000 $0.00 O.OOD $0.00 0,00 <br /> 0110 LOOSE RZP RAP, CLASS 700 $44.00 TON 102.000 $4,488.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0120 60 INCH RCP SD PIPE $170.00 FOOT 35.000 $5,950.00 36.000 $6,120.00 36.000 $6,120.00 103.00 <br /> 0130 24 INCH RCP SD PIPE $64.00 FOOT 38.000 $2,432.00 32.000 $2,048.00 32.000 $2,046.00 84.00 <br /> 0140 8 INCH C900 SD PIPE $17.00 FOOT 30.000 $510.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0150 CONCRETE MANHOLE, D=96" 002 $7,500.00 EACH 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0151 CONC. MH D=96' ALTERNATE 002 $7,189.00 EACH 1.000 $7,189.00 1.000 $7,189.00 1.000 $7,189.00 100.00 <br /> 0160 SLOPE END SECTIONS, 60 INCH $750.00 EACH 1.000 $750.00 1.000 $750.00 1.000 $750.00 100.00 <br /> 0170 SLOPE END SECTIONS, 24 INCH $200.00 EACH 1.000 $200.00. 1.000 $200.00 1.000 .$200.00 100.00 <br /> <br />