New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4546 Babb Const Pmt#2
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4546 Babb Const Pmt#2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2012 4:04:13 PM
Creation date
9/4/2009 1:48:24 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004546
GL_Project_Number
985374
Identification_Number
2010100033
COE_Contract_Number
2009-00030
Retention_Destruction_Date
6/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Run Date: 09/04/2009 09:23:42 <br />City of Eugene <br />Page 4 <br />Contract Preliminary Progress Payment <br />Payment No : 002 <br />Contractor: <br />Job #: <br />Contract No: <br />PO #: <br />Assessable: <br />Line Desc <br />BABB CONSTRUCTION <br />93- 004546 <br />2009 -00030 <br />2010100033 <br />No <br />ription Last Chng Ord <br />Unit Pr <br />Original Contract: $2,120,407.20 <br />Current Amount: $2,129,139.61 <br />Contract Award Date: 07/02/2009 <br />Completion Date: 10/20/2010 <br />Current Contract <br />Unit Measure Quantity <br />Cumulative Totals <br />Amount Quantity Amount <br />% Complete <br />0390 <br />REMOVAL OF EXISTING PAVEMENT M <br />$900.00 <br />LUMPSUM <br />1.000 <br />$900.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0400 <br />PAINT MEDIAN /TRAFFIC CIRCLE CU <br />$2.80 <br />FOOT <br />365.000 <br />$1,022.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0410 <br />PVMT LEGEND, TYPE A -2: SPEED T <br />$250.00 <br />EACH <br />6.000 <br />$1,500.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0420 <br />PVMT LINE, TYPE A -2 <br />$8.95 <br />SQFT <br />25.000 <br />$223.75 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0430 <br />BI- DIRECTIONAL YELLOW TYPE I M <br />$5.25 <br />EACH <br />50.000 <br />$262.50 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0440 <br />THERMOPLASTIC, NON - PROFILE, 90 <br />$2,260.00 <br />LUMPSUM <br />1.000 <br />$2,260.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0450 <br />REMOVE AND REINSTALL EXISTING <br />$2,800.00 <br />LUMPSUM <br />1.000 <br />$2,800.00 <br />0.000 <br />$0.00 <br />0.250 <br />$700.00 <br />25.00 <br />0460 <br />TYPE W1 SIGNS IN PLACE <br />$150.00 <br />EACH <br />5.000 <br />$750.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0470 <br />TYPE Y1 SIGNS IN PLACE <br />$150.00 <br />EACH <br />11.000 <br />$1,650.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0480 <br />SPEED TABLES /RAISED CROSSINGS <br />$5.10 <br />SQFT <br />1,796.000 <br />$9,159.60 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0490 <br />ILLUMINATION <br />$11,545.00 <br />LUMPSUM <br />1.000 <br />$11,545.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0500 <br />IRRIGATION SYSTEM <br />$8,000.00 <br />LUMPSUM <br />1.000 <br />$8,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />TOPSOIL $20.00 TON 300.000 <br />$6,000.00 0.000 $o.00 0.000 _ $0.00 0.00 <br />0520 <br />MEDIANS - SOIL PREPARATION <br />$0.08 <br />SQFT <br />703.900 <br />$56.24 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0530 <br />MEDIANS - TREES <br />$195.50 <br />EACH <br />7.000 <br />$1,368.50 <br />0.000 <br />$0.00 <br />0.000, <br />$0.00 <br />0.00 <br />0540 <br />MEDIANS - PLANTS (2 GAL) <br />$12.00 <br />EACH <br />80.000 <br />$960.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0550 <br />MEDIANS - PLANTS (1 GAL) <br />$5.50 <br />EACH <br />154.000 <br />$847.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0560 <br />MEDIANS - BULBS <br />$1.00 <br />EACH <br />150.000 <br />$150.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0570 <br />MEDIANS - MULCH <br />$28.00 <br />CUYD <br />7.000 <br />$196.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0580 <br />STORMWATER - EROSION PROTECT /S <br />$0.20 <br />SQFT <br />2,713.000 <br />$542.60 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0590 <br />STORMWATER - WETLAND SOD (INST <br />$0.22 <br />SQFT <br />2,713.000 <br />$596.86 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0600 <br />STORMWATER - PERENNIALS (1 GAL <br />$5.50 <br />EACH <br />200.000 <br />$1,100.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0610 <br />STORMWATER - PERM. CHECK DAMS <br />$100.00 <br />EACH <br />19.000 <br />$1,900.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0620 <br />PLANT ESTABLISHMENT PERIOD (ST <br />$1,000.00 <br />LUMPSUM <br />1.000 <br />$1,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />Estimated Payment <br />Amount Quantity <br />
The URL can be used to link to this page
Your browser does not support the video tag.