Run Date: 09/03/2009 15:39:51 <br /> City of Eugene Page 4 <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: BABB CONSTRUCTION Original Contract: <br /> Job 93-003923 $916,940.18 <br /> Contract No: 2009-00027 Current Amount: $918,729.89 <br /> PO 2009100421 Contract Award Date: 06/15/2009 <br /> Assessable: No Completion Date: 10/30/2009 <br /> Line Descri lion Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> P Last Chng Ord Unit Price Unit Measure Quantity Amount Quantit <br /> Y Amount Quantit Amount <br /> 0460 CONCRETE WALKS, 5" THICK $2.53 SQFT 733.000 <br /> $1,854.49 0.000 $0.00 0.000 $0.00 0.00 <br /> 0470 CONCRETE WALKS, 7" THICK $3.34 SQFT 657.000 <br /> $2,194.38 0.000 $0.00 0.000 <br /> o.oo <br /> S o.oa <br /> 04Q0 CONCRETE WALKS, 9" THICK $5.08 SQFT 279.000 <br /> $1,417.32 0.000 $0.00 0.000 $0.00 0.00 <br /> 0490 ADA TEXTURING $18.00 SQFT 120.000 <br /> $z,16o.00 0.000 $a.ao o.ooo $o.oo o.oo <br /> OSOD PVMT LEGEND, TYPE A-2: ARROWS $160.00 EACH 6.000 <br /> $960.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0510 PVMT LEGEND, TYPE A-2: "ONLY" <br /> 220.00 <br /> $ EACH <br /> l.ooo $z2D.oo o.ooo $o.oo a.DOo <br /> $o.oo o.Da <br /> 0520 P <br /> VMT <br /> LEGEND TYPE A-2: BI <br /> CYCLE <br /> $155.00 EACH 8.000 $1,240.00 0.000 $0.00 0.000 0.00 <br /> $ 0.00 <br /> 0530 P <br /> VMT LINE TYP - <br /> EA2 <br /> $8.00 SQFT 424.000 $3,392.00 O.OOD $0.00 0.000 $0.00 0.00 <br /> 0540 BI-DIRECTIONAL YELLOW TYPE Z M $5.10 EACH 50.000 <br /> $255.00 O.D00 $0.00 0.000 $0.00 0.00 <br /> 0550 THERMOPLASTIC, NON-PROFILE, 90 $13,820.00 LUMPSUM 1.000 $13,820.00 0.000 <br /> $0.00 0.000 $0.00 0,00 <br /> 0560 REMOVE AND REINSTALL EXISTING $500.00 LUMPSUM 1.000 <br /> Ssoo.oo o.ooo $o.oo o.ooo $o.ao o.oa <br /> 0570 TYPE R SIGNS IN PLACE $100.00 EACH 2.000 <br /> Szoo.DO a.ooo $o.oo o.ooo $o.oo o.oo <br /> 0580 TYPE W1 SIGNS IN PLACE $150.00 EACH 8.000 <br /> $l,zoa.oo o.oao $o.oo o.ooD $o.oo o.oo <br /> 0590 TYPE W2 SIGNS IN PLACE $150.00 EACH 8.000 <br /> Sl,zoo.oo o.ooo $o.oo o.ooo $o.oo o.oo <br /> 0600 TYPE Y1 SIGNS IN PLACE $150.00 EACH 4.000 <br /> $600.00 O.OOD $0.00 0.000 $0.00 0.00 <br /> 0610 STREET END BARRICADE, TYPE A ~ $400.00 LUMPSUM 1.000 <br /> $400.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0620 STREET LIGHTS, COMPLETE $61,178.00 LUMPSUM 1.000 <br /> $61,178.00 0.500 $30,589.00 0.500 $30,589.00 50.00 <br /> 0630 TRAFFIC SIGNAL .INSTALLATION $137,270.00 LUMPSUM 1.000 $137,270.00 0.220 <br /> $30,199.40 0.220 $30,199.40 M 22,00 <br /> 0640 IRRIGATION SYSTEM $7,000.00 LUMPSUM 1,000 <br /> $7,000.00 0.050 $350.00 0.050 .$350.00 5.00 <br /> 0650 TOPSOIL, IMPORTED $14.60 TON 960.000 <br /> $14,016.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0660 RE-USE OF NATIVE TOPSOILS $8.00 CUYD 400.000 <br /> $3,200.00 38.100 $304.80 38.100 $304.80 10.00 <br /> 0670 PLANTING AREA PREPARATION $0.07 SQFT 8,088.000 <br /> $566.16 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0680 MEDIAN DECIDUOUS TREES (1.5" C $175.00 EACH 9.000 <br /> $1,575.00 O.ODO $0.00 0.000 $0.00 0.00 <br /> 0690 PLANTS (2 GAL.) $12.50 EACH 264.000 $3,300.00 0.000 <br /> $0.00 0.000 $0.00 .0.00 <br /> <br />