CITY OF EUGENE <br /> DEPARTMENT 4F PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job # 3923 <br /> Contract # 2009-00027 <br /> CO(ADDRESOR, 999 Div sign Avtenue o, dba Delta Construction Ca.) Change Order # 2 <br /> Date: 08121109 <br /> ugene R 97404,,,, <br /> CAMS Gate: <br /> Reviewed by. Date: <br /> PROJECT: Chad Drive Extension (Old Cabur~Road) inspector; L. Jeff es <br /> Federal Aid Pr~ect X-STP-2385(056) <br /> „ <br /> Proj. Mgr. J. Willer ` <br /> Principal Eng. P. K[o e <br /> You are directed to make the following, changes in this contract: <br /> Contract <br /> Item <br /> ti~[o. <br /> 800 Add item for "Ex ase and Ca End of Existin 30" Storm Stub-Out" as directed in the field Force Account . <br /> 810 Modification to exisin electrical conduit at North Game Farm Road <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Change Units} Cost Amount ~~I-) Change Change <br /> Ori final 0.00 0,00 $0.00 $0,00 <br /> 800 Expose and cap end of existing 30" storm Revised 0.00 4.00 0.00 <br /> stub-out (Force Account) Amended 1.00 i.S $48fi.16 $48fi.ifi $48fi.ifi <br /> Ori final 0.00 0.00 0.00 $0.00 <br /> 810 Modifications to existing electrical conduit Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS $1,002.00 $1,002,00 $1,OOZ.00 <br /> Ori final 0.00 $0.00 0.00 $OAO <br /> Revised o.ao $o.oa o.oo <br /> Amended 0.00 $OAO $0.00 $0.00 <br /> Ori final 0.00 OAO $0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 $0.00 $0.00 $0,00 <br /> Ori final 0,00 O.DO 0.00 $0.00 <br /> Revised 0.00 0.00 OAO <br /> Amended 0.00 $0.00 $OAO $0.00 <br /> Ori final 0.00 0.00 OAO $0.00 <br /> Revised 0.00 0,00 0,00 <br /> Amended OAO $0.00 $0.00 $0.00 <br /> The original contract work days are o.o da s <br /> The cantract time change this C.0 0.o da s <br /> The contract time change by previous C.O.'s 0.0 da s <br /> The new contract wank da s are 0.0 days <br /> The original contract sum was <br /> $916,940.18 <br /> Net change by previous change order <br /> Net change due to amendment by pr v $o.ao <br /> e loos change order $301.55 <br /> The cantract sum prior to this change order was $917,241.73 <br /> This change order will change contract sum by this amount <br /> $1,488.16 <br /> The new contract net change sum <br /> The new contract amendment $o.oo <br /> sum <br /> $1, 789.71 <br /> The new contract sum including this change order will be $91 s 729 s9 . <br /> Percenta a ofi on final cantract <br /> NET CHANGE RUE TO AMENDMENTS 0,20°10 <br /> 4,20% <br /> <br /> Approval <br /> City Ernginee Prime Contractor Third Party <br /> Date Date Date <br /> D CONTRACTOR ~ OFFICE FILE PURCHASIN <br /> GlCRO <br /> QIFORMSIPROJECTICONSTIREVISEDCHANCE ORDER,XI-5 <br /> <br />