New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4602 KSH Construction CO#3
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4602 KSH Construction CO#3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:02:23 PM
Creation date
9/2/2009 10:38:28 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Journal Entry
PW_Active
No
External_View
No
GJN
004602
GL_Project_Number
995814
COE_Contract_Number
2009-00029
Retention_Destruction_Date
1/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY DF EUGENE <br /> DEPARTMENT OF RUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Drder 4602 <br /> Contract# 2009-29 <br /> CONTRACTOR: KSH Construction Co. Change Order# 3 <br /> (AO©RESS) PO Box 21431 Date; 08 1109 <br /> Keizer OR 97347 GAMS Date: <br /> Reviewed Date: 8121120D9 <br /> PROJECT: PBM Amazon Path Rehabilitation P 'eat Inspector: C. Heakh <br /> from 19 Avenue to 31 sk Avenue D. Reuben <br /> Prof .Mgr. D. Sin er <br /> Principal Eng. P. Kla e ' <br /> You are directed to make the following changes in this contract, <br /> Contract <br /> Item <br /> Na <br /> 330 ASPHALT SEAT. COATING Hea du avement seater <br /> A as aft seal coatin to the as halt section of theAmozon Path ad'acent to the South Eu ene Hi h 5rJteol arkin lot ro ect station 00+8D to D8+85. <br /> Provide surface re oration tratflc control and incidentals re wired for the as alt seal coatin a licaiion. <br /> This work shall be com leted no later then Se tember 4 2x09, <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Chan a (Units) Cost Amount (+1-) Change Change <br /> 33D HEAVY DUTY PAVEMENT SFAL.ER Orl Inal 0.00 0.00 0.00 $p,p0 <br /> Revised OAO 0.00 D.00 <br /> Amended 1A0 LS $1725.64 $1,725,64 $1,725.64 <br /> Ori lnal 0.04 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0,00 $0.00 $0.00 $OAO <br /> Orllnal 0.00 0.00 0.00 $O.OD <br /> Revised 0.00 D.4D OAD <br /> Amended 0.40 $O.DO 0.00 $0.40 <br /> Ori lnal 0.00 0.00 OAO $0.00 <br /> Revised 4.44 o.a4 o.oa <br /> Amended 0.00 $0,00 $0.00 $0,00 <br /> Ori foal 0.04 0.00 0.00 $O,Op <br /> Revised 0.00 0.00 0.00 <br /> Am~taed 4.aa $D.ao $o.DD $4.4a <br /> Dri Inal 0.00 0.00 0,00 $0.00 <br /> Revised 0.00 0.00 OAO <br /> Amended D.00 $0.00 $D.DO $0.00 <br /> The original contract work days are a.a da s <br /> The contract time change this C.Q o.a da s <br /> The contract Time change by previous C.4's o.a da s <br /> The new contract work d s are a.o da s <br /> The original contract sum was <br /> Net change by previous change order _ 53s6,36s.oo <br /> Net change due to amendment by previous change nr~er 550 s34.5o <br /> The contract sum prior to this change ord .~~~~_~.~..."'""~.'~".'~°""..'"..~.°'....'"'..°..~..~'..°..°~"µ""°°."°~.""'°'°T°T' S1s,16o.43 <br /> er was $433,430.93 <br /> This change order will change can#ract sum by this amount,...~"~.~~~~~.~...~.~..~~~~~..~~~~...~....~...~"..~~~~.~....._..~..~.,~.~.~~..~.,.~........~~.~.,...".."" <br /> 51.725.64 <br /> The new contract net change sum <br /> The new contract amendment sum 554 se4.5D <br /> The new contract sum includin this ch n $17,9DB.a7 <br /> g a ge order will be 5435,15s.s7 <br /> Percents a of on foal contract <br /> NETCHANGE Dt1E TO AMENDMENTS r~,,,~...~ 18.76% <br /> I.~ 4,t;9°lo <br /> <br /> Ap alb <br /> fi,A <br /> Clty Engineer~l(IL,. t7 G r or Third Pay <br /> ~Z-~ <br /> `pa#e Date pate <br /> CJ CONTRACTQR ~ OFFICE FILE ~ PURCHASIIVGICRO <br /> QIFORMS1PR03ECT1GONSTIREVISED CHANGI; ORDI=R.XL5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.