New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4612 Eugene Sand 2010-00005
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4612 Eugene Sand 2010-00005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:17:01 PM
Creation date
8/28/2009 2:44:07 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004612
GL_Project_Number
995532
COE_Contract_Number
2010-00005
Retention_Destruction_Date
3/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 08/03J2009 12:22 FA}~ 541 682 8410 CITY EUGENE Pw ENG ~ EUG SAND&GRAVEL f~j0031003 <br /> Additionally the Contractor shall provide a temporary water source (wdte~ truck, trailer, etc.) and <br /> pumping equipment as required during the Plant Establishnnent period. This plant establishment <br /> manual watering work will be paid for on a per visit basis based on a frequency as approved by the <br /> Project Manab~:r. <br /> 01120,X5 Water Meter <br /> (ADD) Availability of water service or meter to the site is unable to be confirmed due to pending EWEB <br /> work in the area. The Contractor shall provide a temporary water source (water truck, trailer, ete_) <br /> and pumping equipment to complete flushing, testing, etc. of the irrigation system as specified. <br /> Work associated to supplyixtg and operating a temporary water source for irrigation installatioxA <br /> shtall be incidental to the irrigation bid item. <br /> CHANGES Tp PROJECT PLANS: <br /> Sheet STP-1-Striping Plan <br /> (DELETE) This sheet in its entirety. Striping work will be completed by others. <br /> Tf you have questions about this addendum or the project please contact Adam Stei'fen at (541) 682-5040 or <br /> adam.r. steffen@ci.eugene.or.us. <br /> All bidders shall acknowledge the receipt of and acceptance of this Addenduxra Na 1 by signing and submitting the <br /> signed Addendum with the bid. Bids submitted without this Addendum, or with the ,Addendum not signed, will be <br /> consid rod inforrnat_ <br /> J <br /> ~ k Sc oening, P.E. <br /> City Engineer <br /> Receipt acknowledged and conditions agreed <br /> r~~ <br /> this day of ~S f , 2009. <br /> Bidder: ti ~ ~/1.~t~d ~r ~ <br /> By. ~ <br /> Addendum #1 -Job #4612 Page 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.