CITY OF EUGENE <br /> PROPOSAL <br /> .AUGUST 6, 2009, 2:00 P.M. JOB #4612 BID NUMBER 23 <br /> TO THE CITY MANAGER BIDDER: ~r . <br /> EUGENE, OREGON <br /> The undersigned Bidder declares: <br /> That Bidder has carefully examined and incorporates in this Proposal, by this reference all documents included <br /> in the. Book of Contract Documents and Specifications for this job which includes but is not limited to the Plans, City <br /> Standard Specifications and Standard Drawings, Supplemental Specifications and-Special Provisions, and City ofEugene <br /> Amendment # 1, Addenda, Bid Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for <br /> ALTON BAKER PARK LOT 8 ACCESS DRIVE <br /> AT 2720 LEO HARRIS PARKWAY <br /> CAPITAL IMPROVEMENT PROJECT <br /> " <br /> That Bidder has made an examination of the site of the proposed work and has made such investigations as are <br /> necessary to determine the character ofthe material and the conditions to be encountered, independently ofthe indication <br /> on the plans; and that if the Proposal is accepted; Bidder will contract with the City of Eugene as provided in the Contract <br /> Form, will to the extent of this bid, provide the necessary machinery, tools, apparatus, and other means of construction, <br /> and will furnish all material and- labor as specified, or called for by the Plans or necessary to complete the work in the <br /> manner specified and in accordance. with the requirements of the Engineer. <br /> The undersigned also agrees that Bidder will order all material and equipment included under this contract and <br /> will commence work~within five (5) days after receipt of Notice to Proceed and that Bidder will complete the work in all <br /> respects after commencement and will have the project completed as specified in the Special Provisions and that Bidder <br /> will pay as liquidated damages to the City for any delay as specified in the Special Provisions. <br /> <br /> PROPOSAL -JOB #4612 PAGE 1 of 3 <br /> <br />