<br /> y, ~ ae, ~ - <br /> - <br /> PUBLIC IMPROVEMENT CONTRACT FOR USE WITH <br /> OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION <br /> BETWEEN: The City of Eugene, an Oregon <br /> Municipal Corporation (City) <br /> AND: Eugene Sand Construction, inc. (Contractor) <br /> CONTRACT NO.: 2010-00005 <br /> JOB NO.: 4612 <br /> PROJECT: ALTON BAKER PARK LOT 8 ACCESS DRIVE AT 2720 LEO HARRIS <br /> PARKWAY <br /> RECITALS <br /> Contractor was the successful bidder for the contract construction of the public <br /> improvement project described in the plans and specifications for the project that were included in <br /> the bid documents and the Oregon Standard Specifications for Construction which form a part of <br /> the Contract. <br /> AGREEMENT <br /> 1. The Contract. The Contract between the City and Contractor (the "Contract") includes. this <br /> Document and its exhibits, together with all of the documents and materials included in the <br /> definition'of the "Contract" under the 2008 Oregon Standard Specifications for Construction, <br /> Volumes t and II, issued by the Oregon Department of Transportation, as modified by the . <br /> City's Amendments to the Specifications for Volume I (the "General Conditions"), and Volume <br /> II Supplemental Specifications for the Project and any other Special Provisions included in <br /> the Bid Documents (all specifications, plans, drawings and Special Provisions included in the <br /> Contract are collectively referred to herein as the "Specifications"). In addition,. the Contrac# <br /> between the City and Contractor shall be deemed to incorporate all reports; records., laws, <br /> rules and orders referenced in the Contract .documents. <br /> This Document includes and incorporates the following Exhibits: <br /> Exhibit A -Solicitation Documents <br /> 2. Definitions. Unless otherwise specifically defined in this Document, all capitalized terms <br /> which are not proper nouns shall have the meanings assigned thereto in the Specifications. <br /> 3. ,Project. The project is generally described as: <br /> ALTON BAKER PARK LOT 8 ACCESS DRIVE AT 2720 LEO HARRIS PARKWAY <br /> 4. .Work to be Performed. Contractor agrees to furnish, as the "Work," all-services, labor, <br /> materials and equipment which are described as Contractor's responsibility in the <br /> Specifications, as the same may be modified in accordance with the Contract, and to <br /> construct the improvement described therein (the "Project"), all according to the provisions of <br /> the Contract. All parts of the Work are the sole responsibility of Contractor. <br /> Public Improvement Contract for Use with Oregon Standard Specifications -Page 1 <br /> (Revised October 2008) 999~~~ <br /> <br />