...PUBLIC IMPROVEMENT CONTRACT fOR USE WITH <br /> OREGON STANDARDSPECIFICATIONS FOR CONSTRUCTION <br /> (SAMPLE) . <br /> . BETWEEN: The City of Eugene, an Oregon <br /> .Municipal Corporation (City) <br /> <br /> ' AND: (Contractor). <br /> CONTRACT NO.: <br /> JOB NO.: 4612 <br /> :PROJECT:. ALTON BAKER PARK LOT 8 ACCESS DRIVE AT 2720 LE.O. HARRIS <br /> .PARKWAY <br /> RECITALS <br /> Contractor was the successful bidder for the contract construction of the public <br /> improvement project described in the plans and specifications for the project that were included in <br /> the bid documents and the Oregon Standard Specifications for Construction which form a part of <br /> the Contract. <br /> .AGREEMENT • <br /> 1. The Contract. The Contract between the City and Contractor.{the "Contract").includes this. <br /> Document and its exhibits, together with all of the documents and materials included in the <br /> definition of the "Contract" under the 2008 Oregon Standard Specifications for Construction, <br /> Volumes I and II, issued by the Oregon Department of Transportation, as modified by the <br /> City's Amendments to the Specifications for Volume l (the "General Conditions"),.and Volume- <br /> ll. SupplementalSpecifications for the Project and any other Special Provisions included in <br /> the Bid Documents (all specifications, plans, drawings and. Special Provisions included in the <br /> .:Contract are collectively referred to herein as the "Specifications"). In addition, the Contract <br /> between the City and Contractor shall be .deemed to incorporate all reports, records, laws, <br /> rules and orders referenced. in the Contract documents, <br /> This Document includes and incorporates the follovving Exhibits: <br /> Exhibit A -Solicitation Documents <br /> 2. Definitions. Unless otherwise specifically defined in this bocument, all capitalized terms <br /> which are not proper nouns. shall have the. meanings assigned thereto in the Specifications. <br /> 3. Project.. The .project is generally described as: <br /> AL'TON -BAKER PARK. LOT 8 ACCESS DRIVE AT 2720 LEO HARRIS PARKWAY <br /> 4. Work to be Performed. Contractor agrees to furnish, as the "Work," all services, labor, <br /> materials and equipment which are described as Contractor's responsibility in the <br /> Specifications, as the same may be modified in accordance with the Contract, and to <br /> construct the improvement described therein {the "Project"); all according to the.provisions of <br /> the Contract. All parts of the Work are the sole responsibility of Contractor. <br /> Public Improvement Contract for Use with Oregon Standard Specifications.- Page 1 <br /> • (Revised Octobec2008) <br /> <br />