Fillmore Street, East 32nd Ave and Praslin Street Traffic Calming <br /> 8/3/2009 <br /> Construction Estimate ~ ~ x <br /> <br /> i v <br /> V Glv t~~5 ~,oe~ <br /> Unit Qty Cost .Total <br /> Mobilization Is 1 $4,116.67 $4,116.67 . <br /> Erosion Control Is 1 $500.00 $500.00 <br /> Traffic Control Is 1 $6,000.00 $6,000.00 <br /> Speed Hump ea 13 $1,500.00 $19,500.00 <br /> Legends ea 26 $375.00 $9,750.00 <br /> Traffic Signs Lnstalled ea 6 $300.00 $1,800.00 <br /> $41,666.67 <br /> ,L l~ ~ <br /> ~S~ 2~~a ~ ~ ~4~ ~ ~I <br /> ~ <br /> ~ <br /> ~ - G~-- <br /> - t~~ c~ ~ ~ <br /> ~ n _ <br /> ~i4J1. Fi ~l G ~a~l~ ~G~.aCx <br /> ~d4v~l~~ <br /> <br />