NOAA 2009 Grant Application -Tables for Budget Narrative <br /> <br /> Ri arian Bench Construction Quantity Unit Cost/Unit TOTAL ' <br /> Haul and Place Dragonfl Bend Mat'I 30,000 cu ds $ 8.5 $ 255,000 ~ ~ <br /> Buy, haul and place additional fill material 33;800. cu ds $ 15 $ 507,000 S`~ <br /> Grand Total ~ $ 762,000 <br /> Quantity Unit Cost/Unit TOTAL <br /> <br /> Channel excavation 7 channel $ 8 857 $ 62 000 <br /> Quantity Unit CostlUnit TOTAL <br /> Soil Amendment and seedin 4.6 ac $ 11,845 $ 54,487 S <br /> Quantity Unit CostlUnit TOTAL <br /> Weed control -manual control 16.4 ac $ 2,000 $ 32,800 <br /> Quantity Unit Cost/Unit TOTAL <br /> Weed control - s of s ra 16.4 ac $ 300 $ 4,920 <br /> Ri arian Plantin Quantity Unit CostlUnit TOTAL <br /> Plant new "benches" 4.6 ac $ 21,723 $ 99,925 <br /> Plant "non-bench" areas 16.4 ac $ 12,155 $ 199,350 <br /> Plant Establishment Work. (1 yr watering and weed 42 ac $ -5,000 $ 210,000 <br /> control <br /> - Grand Total $ 509,275 <br /> Ri arian Plantin Quantity Unit Cost/Unit OWES <br /> Plant "non-bench" areas 16.4 ac $ 12,155 $ 69;044 <br /> Plant Establishment Work (1 yr watering and weed 42 ac $ 5,000 $ 54,000 <br /> control <br /> <br />