i <br /> SOUTH AERATION BASIN IMPROVEMENTS <br /> Facility Process Component <br /> Secondary Treatment <br /> i <br /> $7,603,000 <br /> Total Cost <br /> PRIOR J <br /> Costs EXPEND- 2005-06* 2006-07 2007-08 2008-09 2009-10 TOTAL <br /> ITURES . <br /> Design & Engineering 100,000 590,000 690,000 <br /> Construction 6 913 000 6 913 000 <br /> TOTAL 100 000 .7,503 000 0 0 0 0 7,603;000 <br /> FUNDING SOURCE <br /> Capital Reserve 100,000 6,103,000 6,203,000 <br /> SDC Improvement Reserve 1 400 000 1,400,000 <br /> TOTAL 100,000 7,503,000 0 0 0 0 7,603;000 <br /> * Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br /> PROJECT: South Aeration Basin Improvements Design and Construction ` <br /> <br /> i <br /> DESCRIPTION: Add step feed, anoxic selectors, and fine bubble diffusers to south aeration basin. Remove <br /> hydraulic restrictions in both south and north aeration basins (effluent gates). Includes <br /> future primary effluent flow control gates for both north and south aeration basins. <br /> JUSTIFICATION: Increase the dry weather aeration basin treatment capacity to 65 mgd with respect to <br /> ammonia (i.e., with nitrification) and increase the sustained (i.e., on a weekly basis) wet <br /> weather treatment capacity to 130 mgd. <br /> PROJECT DRIVER: NPDES permit includes ammonia limit requiring nitrification in dry weather and expansion of <br /> wet weather capacity to treat wet weather flows to meet ?NPDES monthly and weekly <br /> suspended solids limits. <br /> PROJECT TRIGGER: Maximum month dry weather flow of 25 mgd requiring nitrification. May flows and <br /> temperatures could require the use of the south aeration basins in conjunction with the <br /> north aeration basins. Peak wet weather flows above 103 mgd require hydraulic <br /> modifications. <br /> TYPE OF PROJECT: 50% Capacity; 50% Performance <br /> ESTIMATED PROJECT COST $6,900,000 <br /> (FY 2004-05 Dollars): <br /> INFLATED PROJECT COST $7,603,000 <br /> (FY 2005-06 Dollars): <br /> PHASING: Budgeted for FY 2004/05, Rebudgeted for FY 2005/06 <br /> I <br /> I__. <br /> i <br /> Page 69 FY OS-06 BUDGET AND CIP <br /> <br />