New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2005-06 MWMC Budget & CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2005-06 MWMC Budget & CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2009 5:00:01 AM
Creation date
8/21/2009 11:29:39 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Wastewater
PW_Subject
MWMC
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> SOUTH AERATION BASIN IMPROVEMENTS <br /> Facility Process Component <br /> Secondary Treatment <br /> i <br /> $7,603,000 <br /> Total Cost <br /> PRIOR J <br /> Costs EXPEND- 2005-06* 2006-07 2007-08 2008-09 2009-10 TOTAL <br /> ITURES . <br /> Design & Engineering 100,000 590,000 690,000 <br /> Construction 6 913 000 6 913 000 <br /> TOTAL 100 000 .7,503 000 0 0 0 0 7,603;000 <br /> FUNDING SOURCE <br /> Capital Reserve 100,000 6,103,000 6,203,000 <br /> SDC Improvement Reserve 1 400 000 1,400,000 <br /> TOTAL 100,000 7,503,000 0 0 0 0 7,603;000 <br /> * Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br /> PROJECT: South Aeration Basin Improvements Design and Construction ` <br /> <br /> i <br /> DESCRIPTION: Add step feed, anoxic selectors, and fine bubble diffusers to south aeration basin. Remove <br /> hydraulic restrictions in both south and north aeration basins (effluent gates). Includes <br /> future primary effluent flow control gates for both north and south aeration basins. <br /> JUSTIFICATION: Increase the dry weather aeration basin treatment capacity to 65 mgd with respect to <br /> ammonia (i.e., with nitrification) and increase the sustained (i.e., on a weekly basis) wet <br /> weather treatment capacity to 130 mgd. <br /> PROJECT DRIVER: NPDES permit includes ammonia limit requiring nitrification in dry weather and expansion of <br /> wet weather capacity to treat wet weather flows to meet ?NPDES monthly and weekly <br /> suspended solids limits. <br /> PROJECT TRIGGER: Maximum month dry weather flow of 25 mgd requiring nitrification. May flows and <br /> temperatures could require the use of the south aeration basins in conjunction with the <br /> north aeration basins. Peak wet weather flows above 103 mgd require hydraulic <br /> modifications. <br /> TYPE OF PROJECT: 50% Capacity; 50% Performance <br /> ESTIMATED PROJECT COST $6,900,000 <br /> (FY 2004-05 Dollars): <br /> INFLATED PROJECT COST $7,603,000 <br /> (FY 2005-06 Dollars): <br /> PHASING: Budgeted for FY 2004/05, Rebudgeted for FY 2005/06 <br /> I <br /> I__. <br /> i <br /> Page 69 FY OS-06 BUDGET AND CIP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.