New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2005-06 MWMC Budget & CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2005-06 MWMC Budget & CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2009 5:00:01 AM
Creation date
8/21/2009 11:29:39 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Wastewater
PW_Subject
MWMC
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> ''.r <br /> WILLAKENZIE PUMP STATION EXPANSION <br /> ~ Facility Process Component <br /> Collection System Pump Stations <br /> <br /> ~ $6,377,000 <br /> Total Cost ' <br /> PRIOR <br /> Costs EXPEND- 2005,06* 2006-07 ' 2007-08 2008-09: 2009-10 TOTAL <br /> ITURES <br /> Construction 6,377 000 6,377,000 <br /> TOTAL 0 6,377 000 0. 0 0 0 6 377 000 <br /> ' FUNDING SOURCE <br /> Capital Reserve 4,177,000 4,177,000 <br /> SDC Reimbursement Reserve 1,200,000 1,200,000 <br /> SDC Improvement Reserve 1 000 000 1 000 000 <br /> TOTAL 0 6,377,000 0 0 0 0 6,377,000 <br /> ' * Inflated from 2004 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br /> PROJECT: Willakenzie Pump Station Expansion <br /> DESCRIPTION: Add four, 14-mgd pumps to increase capacity from 80 to 135 mgd. <br /> JUSTIFICATION: Additional pumping, capacity is required to increase total influent pumping capacity to 277 <br /> mgd.. <br /> PROJECT DRIVER: Systematic elimination of sanitary sewer overflows by the year 2010. <br /> PROJECT TRIGGER: Collection system computer model estimates the current wet weather peak flow to plant to <br /> be 264 mgd. Overall existing peak flow capacity is 175 mgd so there is already a capacity <br /> deficit. <br /> TYPE OF PROJECT: 100% Capacity <br /> ESTIMATED PROJECT COST $6,000,000 <br /> (FY 2004-05 Dollars): <br /> INFLATED PROJECT COST $6,377,000 <br /> (FY 2006-07 Dollars): <br /> PHASING: Budgeted for FY 2005/06 <br /> Page 60 FY OS-06 BUDGET AND CIP <br /> _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.