New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2005-06 MWMC Budget & CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2005-06 MWMC Budget & CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2009 5:00:01 AM
Creation date
8/21/2009 11:29:39 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Wastewater
PW_Subject
MWMC
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Eugene Budget Detail <br /> <br /> ~ CITY OF EUGENE <br /> REGIONAL WASTEWATER PROGRAM RESPONSIBILITIES <br /> <br /> I" <br /> The Wastewater Division for the City of Eugene manages all regional wastewater pollution <br /> control facilities serving the Eugene/Springfield and River Road/Santa Clara areas under the <br /> Intergovernmental Agreement with the Metropolitan Wastewater Management Commission <br /> (MWMC). <br /> These regional facilities include the Eugene/Springfield Regional Water Pollution Control <br /> Facility (WPCF), the 154 acre Biosolids Management Facility, the 286 acre Seasonal Industrial <br /> Waste Facility, the 600 acre Biocycle Farm site, and regional wastewater pumping stations and <br /> transmission sewers. In support of the water pollution control program, the Division also <br /> provides technical services for wastewater treatment, management of equipment replacement <br /> - and infrastructure rehabilitation, biosolids treatment and recycling, an industrial source control <br /> and pretreatment program in conjunction with City of Springfield staff, regional laboratory <br /> services for wastewater and water quality analyses, and flow monitoring on the regional <br /> sanitary trunk sewers. <br /> ADMINISTRATIVE AND MANAGEMENT SERVICES <br /> Administrative Services provides management, administrative, and office support to the <br /> Wastewater Division. This support includes the general planning, directing, and managing of <br /> the activities of the Division; development and coordination of the budget; administration of <br /> personnel records; and processing of payroll, accounts payable, and accounts receivable. This <br /> section also provides tracking and monitoring of all assets for the regional wastewater <br /> treatment facilities and clerical support for reception, telephone services, and other <br /> miscellaneous needs. Another area this program administers is the coordination of local and <br /> regional billing and rate activities. <br /> REGIONAL WASTEWATER TREATMENT <br /> FACILITY OPERATIONS <br /> The Wastewater Division operates the WPCF to treat domestic and industrial liquid wastes to <br /> achieve an effluent quality that protects and sustains the beneficial uses of the Willamette <br /> River. The WPCF is designed to treat 49 million gallons per day (MGD) of dry weather flow, <br /> with a peak hydraulic capacity of 105 MGD for full secondary treatment. The Operations <br /> section optimizes integrated wastewater treatment processes to ensure effluent quality <br /> requirements are met in an effective manner. In addition, the Operations section provides 24 <br /> hour/day alarm monitoring of all plant processes, regional and local pump stations, and the <br /> Biosolids and Seasonal Industrial Waste Facilities. <br /> REGIONAL WASTEWATER TREATMENT <br /> FACILITY MAINTENANCE <br /> Preservation of the multi-million dollar investment in the equipment and infrastructure of the <br /> WPCF is the responsibility of the Maintenance section of the Wastewater pivison. This <br /> section provides a preventative maintenance program to maximize equipment. life and <br /> performance; a corrective maintenance program for repairing unanticipated equipment failures; <br /> Page 45 FY OS-06 BUDGET AND CIP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.