I <br /> Run Date: 08/05/2009 19:42:54 Page 3 <br /> City of Eugene <br /> Contract Preliminary Progres's Payment. <br /> Payment No 002 <br /> 1 <br /> Contractor: BABB CONSTRUCTION Original Contract: $916,940.18 <br /> ' Job 93-003923 Current Amount: $917,241.73 <br /> Contract No: 2009-00027 Contract Award Date: 06/15/2009 <br /> PO 2009100421 Completion Date: 10/30/2009 <br /> Assessable: No <br /> I <br /> Current Contract Estimated Payment Cumulative Totals $ Complete <br /> Line Description Last Chnq Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0220 6 INCH WASTEWATER PIPE, 0-5' D $34.00 FOOT 444.000 $15,096.00 383.300 $13,032.20 383.300 $13,032.20 86.00 <br /> <br /> I 0230 8 INCH WASTEWATER PIPE, 5-8' D $35.00 FOOT 988.000 $39,580.00 1,059.200 $37,072.00 1,059.200 $37,072.00 107.00 <br /> 4240 10 INCH STORM DRAIN PIPE, 0-5' $28.50 FbOT 237.000 $6,759.50 71.300 $2,032.05 71.300 $2,032.05 30.00 <br /> 0250 12 INCH STORM DRAIN PIPE 0-5' $30.50 FOOT 64.000 $1,952.00 102.400 $3,123.20 102.400 $3,123.20 160.00 <br /> 0260 12 INCH STORM DRAIN PIPE, 5-8' $30.50 FOOT 577.000 $17,598.50 0.000 $0.00 0.000 $0.00 0.00 <br /> 0270 15 INCH STORM DRAIN PIPE, 0-5' $31.25 FOOT 206.000 $6,437.50 206.000 $6,437.50 206.000 $6,437.50 100.00 <br /> 0280 18 INCH STORM DRAIN PIPE, 5-8' $37.50 FOOT 455.000 $17,062.50 180.500 $6,768.75 180.500 $6,768.75 40.00 <br /> 0290 24 INCH STORM DRAIN PIPE, 5-8' $49.50 FOOT 119.000 <br /> $5,890.50 358.900 $17,765.55 358.900 $17,765.55 302.00• <br /> 0300 VIDEO INSPECTION $1.00 FOOT 2,833.000 $2,833.00 0.000 $0.00 ,0.000 $0.00 0.00 <br /> 0310 MODIFIED DITCH INLET TYPE <br /> D $937.36 EACH 11.000 10 310.96 <br /> $ 0.000 $0.00 0.000 $O.OD 0.00 <br /> 0320 CONCRETE SANITARY WASTEWATER M $2,900.00 EACH 8.000 $19,200.00 8.000 $19,200.00 8.000 $19,200.00 100.00 <br /> 0330 CONCRETE STORM DRAIN MANHOLES $2,300.00 EACH 11.000 $25,300.00 4.000 $9,200.00 4.OD0 $9,200.00 36.00 <br /> 0340 MINOR ADJUSTMENT OF MANHOLES $400.00 EACH 1.000 $900.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0350 MAJOR ADJUSTMENT OF MANHOLES.. $1,000.00 EACH 1.000 $1,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0360 3/4"-0 AGGREGATE BASE $12.54 TON 791.000 $9,919.19 0.000 $0.00 0.000 $0.00 0.00 <br /> 0370 2" - 0 AGGREGATE BASE $12.54 TON 9,992.000 $55,702.68 0.000 $0.00 0.000 $0.00 O.DO <br /> 0380 LEVEL 2, 1/2" DENSE HMAC $62.85 TON 30.000 $1,885.50 0.000 $0.00 0.000 $0.00 0.00 <br /> 0390 LEVEL 3, 1/2" DENSE HMAC $48.50 TON 3,835.000 $185,997.50 O.OOD $0.00 0.000 $0.00 M 0.00 <br /> 0900 EXTRA. FOR DRIVEWAYS $1.77 SQFT 2,056.000 $3,639.12 0.000 $0.00 0.000 $0.00 0.00 <br /> 0410 REVERSE CURB AND GUTTER $8.60 FOOT 1,685.000 $19,491.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0420 CONCRETE CURB AND GUTTER $8.60 FOOT 3,139.000 $26,995.40 0.000 $0.00 0.000 $0.00 0.00 <br /> 0430 CURB CUT OUTS AND SPILLWAYS $76.90 EACH 15.000 $1,196.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0940 CONCRETE DRIVEWAYS $9.29 SQFT 2,589.000 $10,977.36 0.000 $0..00 0.000 $0.00 D.00 <br /> 0950 CONCRETE WALKS $2.39 SQFT 21,939.000 $52,422.26 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />