Run Date: 08/10/2009 10:19:44 <br /> Page 6 <br /> City of Euqene <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: WIliDISH CONSTRUCTION Original Contract: $811,896.00 <br /> Job 93-004502 Current Amount: $811,896.00 <br /> Contract No: 2009-00019 Contract Award Date: 04/23/2009 <br /> PO 2.009100355 Completion Date: 07/31/2009 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals % Complete <br /> Line Description Last Chnq Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0850 MONO-DIRECTIONAL CRYSTAL TYPE $5.00 EACH 6.000 $30.00 3.400 $17.00 10.400 $52.00 173.00 <br /> 0860 BI-DIRECTIONAL YELLOW TYPE I M $5.00 EACH 139.000 $695.00 31.200 $156.00 111.200 $556.00 80.00 <br /> 0870 THERMOPLASTIC, NON-PROFILE, 90 <br /> $10,500.00 LUMPSUM 1.000 $10,500.00 -0.100 ($1,050.00) 0.900 $9,950.00 90.00 <br /> 0880 LOOP DETECTORS INSTALLATION $535.00 EACH 9.000 $9,815.00 0.000 $0.00 9.000 $9,815.00 100.00 <br /> 0890 CONDUIT $38.00 FT 200.000 $7,600.00 0.000 $0.00 112.000 $9,256.00 56.00 <br /> 0900 JUNCTION BOX, TYPE 2 $335.00 EACH 6.000 $2,010.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0910 REMOVAL OF PEDESTRIAN BUTTONS $125.00 EACH 9.000 $1,125.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0920 PEDESTRIAN PUSH BUTTON POSTS $850.00 EACH 6.000 $5,100.00 0.000 $0.00 0.000 $O.OD 0.00 <br /> 0930 8 INCH PVC WW PIPE $150.00 FT 48.000 $7,200.00 0.000 $0.00 65.000 $9,750.00 135.00 <br /> 0940 18 INCH PVC SD PIPE $150.00 FT 63.000 $9,450.00 0.000 $0.00 99.000 $7,350.00 78.00. <br /> 0950 MECHANICAL PIPE PLUG, 18 INCH $150.00 EACH '1.000 $150.00 0.000 $0.00 1.000 $150.00 100.00 <br /> <br /> 0960 MECHANICAL PIPE PLUG, 8 INCH $50.00 EACH 1.000 fin?/ $50.00. O.ODD $0.00 1.000 $50.00 100.00 <br /> A j\ $216,655.00 $322.90 2 $180,909.86 <br /> (I;~ ~a f( <br /> W <br /> ~ g <br /> 2 <br /> U <br /> ~ <br /> <br />