Run Date: 08/05/2009 11:48:04 Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 007 Final Pay <br /> Contractor: DELTA CONSTRUCTION Original Contract: $111,450.00 <br /> Job 93-004535 Current Amount: $115,839.85 <br /> Con - <br /> tract No: 2009 00007 <br /> Contract Award Date: 09/09/2008 <br /> PO 2009100129 Completion Date: 12/31/2008 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals % Complete <br /> Line Description Last Chnq Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> PINE CANYON DR STORMWATER REPAIRS <br /> i <br /> General <br /> DODO Li uidated Dama es <br /> q q ($300.00) DAY O.D00 $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $7,400.00 LUMPSUM 1.D00 $7,400.00 0.000 $D.00 1.000 $7,900.00 100.00 <br /> 0020 EROSION CONTROL $850.00 LUMPSUM 1.000 $850.00 0.000 $0.00 1.000 $850.00 100.00 <br /> 0030 TEMP. WORK ZONE TRAFFIC CONTRO $600.00 LUMPSUM 1.000 $600.00 0.000 $0.00 1.000 $600.00 100.00 <br /> 0090 TREE, REMOVAL. $200.00 EACH 6.000 $1,200.00 0.000 $0.00 6.000 $1,200.00 100.00 <br /> 0050 TOP TREE $300.00 EACH 3.000 $900.00 0.000 $0.00 3.000 $900.00 100.00 <br /> 0060 DRAIN PIPE METAL 15" $70.00 LINFT 8.000 $560.00 0:000 $0.00 9.000 $630.00 113.00 <br /> 0070 16 INCH AWWA C-905 PVC PIPE $70.00 LINFT 6.000 $920.00 0.000 $0.00 6.000 $920.00 100.00 <br /> D080 MH FLAT TOP - STM $3,100.00 EACH 1.000 $3,100.00 0.000 $0.00 1 000 $3 100 00 100 00 <br /> 0090 CLEANOUT ADJUSTMENT -SAN $250.00 EACH 1.000 $250.00 0.000 $0.00 1.000 $250.00 100.00 <br /> 0100 EROSION PREVENTION COIR FABRIC $6.00 SgYD 650.000 $3,900.00 0.000 $0.00 1,309,600 $7,657.60 201.00 <br /> I <br /> 0110 NON-WOVEN FILTER FABRIC $3.00 SQYD 300 000 $900 00 0 000 $0 00 200 000 $600 00 67 00 <br /> 0120 TREE PROTECTION FENCING $2.00 FOOT 650.000 $1,300.00 0.000 $0.00 107.000 $219.00 .16.00 <br /> 0130 BOULDERS, Class 300 $50.00 TON 20.000 $1,000.00 0.000 $0.00 98.350 $4,917.50 492.00 <br /> 0140 BOULDERS, Class 200 $50.00 TON 20.000 $1,000.00 0.000 $0.00 57.190 $2,859.50 286.00 <br /> 0150 BOULDERS, Class 100 Rip Rap $50.00 TON 200.000 $10,000.00 0.000 $0.00 69.360 $3,968.00 35.00 <br /> 0160 3"-0 AGGREGATE $3-0.00 TON 100.000 $3,000.00 0.000 $O.DD 50.790 $1,523.70 51.00 <br /> 0170 CONCRETE DITCH INLETS $2,000.00 EACH 1 000 $2,000 00 0 000 $0 00 1 000 $2,000 00 100 00 <br /> 0180 OPEN CHANNEL ENHANCEMENT $40,000.00 FRCACCT 1.000 $40,000.00 0.000 $0.00 0.616 $29,636.00 M 62.00 <br /> 0190 FINISH GRADING $10,000.00 FRCACCT 1.000 $10,000.00 0.000 $0.00 0.359 $3,599.12 35.00 <br /> 0200 MULCH $60.00 CUYD 100.000 $6,000.00 0.000 $0.00 180.540 $10,832.40 181.00 <br /> 0210 CONCRETE INLETS, TYPE 24" AREA $2,370._00 EACH 1.000 $2,370.00 0.000 $O.DO 1.OD0 $2,370.00 100.00 <br /> <br /> i <br /> <br />